A project requires a new server to be set up with the abilit

题目
单选题
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
A

Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.

B

Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.

C

Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.

D

One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

● The difference between a project and a program is that:

A A program is made up of multiple projects

B A program requires at least three times longer to plan than a project

C A project is a one-shot deal while a program is on-going

D A and C

E B and C


正确答案:D

第2题:

A new()will be set up in this area so we will have enough electricity in the future.

Apower station

Belectricity station

Cpower factory

Delectrical station


A

第3题:

The difference between a project and a program is that:

A.A program is made up of multiple projects

B.A program requires at least three times longer to plan than a project

C.A project is a one-shot deal while a program is on-going

D.A and C

E.B and C


正确答案:D
D

第4题:

A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

  • A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
  • B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
  • C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
  • D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

正确答案:B

第5题:

After installing a second processor and corresponding heatsink into a server, an administrator notices that the new processor is not showing up during POST.  Which of the following could be the cause of this issue?()

  • A、 The power supply is not sufficient to power the server.
  • B、 The voltage regulator module (VRM) was not installed.
  • C、 The IRQ setting was not set.
  • D、 The DMA setting was not set.

正确答案:B

第6题:

You are the administrator of a 12 SQL Server 2000 computers. These servers are located in company offices throughout the world.

You configure a multiserver job on the server in your company's New York City office. You configure this server as a master server, and designate the remaining 11 servers as target servers.

After the job completes successfully, you decide to set up a new SQL Server 2000 computer as the master server. The new server will be named JobMaster and the other 12 servers will be target servers.

You need to make the New York City server a target server instead of a master server. What should you do?

A.On the New York City server, defect all 11 target servers. On the JobMaster server, enlist the 12 servers as target servers.

B.On the JobMaster server, enlist all other servers as target servers.

C.On the New York City server enlist the JobMaster server as a target server. Transfer the multiserver jobs from the New York City server to the JobMaster server.

D.On the JobMaster server, enlist the New York City server as a target server. On the JobMaster server, enlist the other 11 servers as target servers. On the JobMaster server, defect the New York City server.


正确答案:A
解析:Explanation:Whensettingupanewmasterserver,theoldmasterservermustdefectallitstargetservers.Whenanewlydesignatedmasterserverreplacesanexistingmasterserver,thetargetserversmustbedefectedfromtheexistingmasterserver.Thetargetserverscanthenbeenlistedonthenewmasterserver.Thiscanincludetheexistingtargetserver.Note:InSQLServer2000EnterpriseEdition,multiserveradministrationisusedtoautomatetheadministrationofmultipleinstancesofSQLServer2000.Itcanbeusedtomanagetwoormoreserversandtoscheduleinformationflowsbetweenenterpriseserversfordatawarehousing.Withmultiserveradministration,theremustbeatleastonemasterserverandatleastonetargetserver.Amasterserverdistributesjobstoandreceiveseventsfromtargetservers.Amasterserverstoresthecentralcopyofjobdefinitionsforjobsrunontargetservers.Targetserversconnectperiodicallytotheirmasterservertoupdatetheirlistofjobstoperform.Ifanewjobexists,thetargetserverdownloadsthejobanddisconnectsfromthemasterserver.Afterthetargetservercompletesthejob,itreconnectstothemasterserverandreportsthestatusofthejob.WithSQLServer2000EnterpriseEdition,masterserverscanenlisttargetserversandcandefecttargetservers.IncorrectAnswers:B:ThissolutiondoesnotaddresstheneedtodemotetheNewYorkCityserver.Itisthusstillamasterserver.C:InthissolutiontheJobMasterserverisenlistedasatargetserveroftheNewYorkCityserver.ThissolutionalsodoesnotaddresstheneedtodemotetheNewYorkCityserver.Itisthusstillamasterserver.D:InthissolutiontheNewYorkCityserverisnotatargetserveroftheJobMasterserverasithasbeendefectedfromtheJobMasterserver.

第7题:

Company.com network consists of a single Active Directory domain named  Company.com.Company.com has an Exchange Server 2010 organization.The Company.com employees use Microsoft Office Outlook 2007 to connect to their mailboxes.RPC over HTTP and Auto discover are configured on Microsoft Office Outlook 2007. A new Company.com security policy requires that the employees connected to the domain does not need authentication when using Outlook Anywhere.However, those not connected t the domain needs to be authentication when using Outlook Anywhere.The employees need to comply with the new Company.com security policy.  What should you do?()

  • A、You should consider using Basic authentication on Outlook Anywhere and set up only Basic authentication on the RPC virtual directory.
  • B、You should consider using NTLM authentication on Outlook Anywhere and set up Basic authentication and NTLM authentication on the RPC virtual directory.
  • C、You should consider using NTLM authentication on Outlook Anywhere and set up only Basic authentication on the RPC virtual directory.
  • D、You should consider using Basic authentication on Outlook Anywhere and set up Basic authentication and NTLM authentication on the RPC virtual directory.

正确答案:B

第8题:

37 The difference between a project and a program is that:

A. A program is made up of multiple projects

B. A program requires at least three times longer to plan than a project

C. A project is a one-shot deal while a program is on-going

D. A and C

E. B and C


正确答案:D

第9题:

An administrator notices that every time a particular server is restarted it requires a password in order for the server to begin the start up process. Which of the following is the reason this is happening?()

  • A、The server needs to have the password service verified and reconfigured.
  • B、The server administrator has set a password policy in Group Policy.
  • C、The server has the BIOS setting configured incorrectly.
  • D、The server is set with a boot password before accessing the OS

正确答案:D

第10题:

You work as the enterprise exchange administrator at Company.com.The Company.com network consists of a single Active Directory domain named Company.com.Company.com has an Exchange Server 2010 organization.Company.com contains an exchange server 2010 mailbox server named -sr10.quite a few mailbox databases reside on -sr10.you have received instructions from the cio to set an alert on the volume of the mailbox database files, if the free space is less than 20%.What should you do?()

  • A、The best option is to set up a new Event Viewer Subscription.
  • B、The best option is to set up a new Data Collector Set.
  • C、The best option is to attach a new task to the Application event log.
  • D、The best option is to change the properties of the mailbox database objects.

正确答案:B

更多相关问题