The term "()" is commonly used to name the work of the 17th

题目
填空题
The term "()" is commonly used to name the work of the 17th - century writers who wrote under the influence of John Donne.
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The term sociolect is used for less drastic difference which is restricted to variation in pronunciation.()


参考答案:错误

第2题:

The term geographical dialect is used for less drastic difference which is restricted to variation in pronunciation.()


参考答案:错误

第3题:

The term “metaphysical poetry” is commonly used to name the work of the 17th-century writers who wrote under the influence of________

A.John Milton

B.John Donne

C.Ben Jonson

D.John Bunyan


参考答案:B

第4题:

Which of the following protocols is commonly used for VoIP technology?()

A.Telnet

B.SMTP

C.SIP

D.SNMP


参考答案:C

第5题:

___endorsement is the simplest and the most commonly used form. of endorsement.

A.blank

B.restrictive

C.special

D.qualified


正确答案:A

第6题:

Register is a term widely used in sociolinguistics to refer to varieties according to use.()


参考答案:正确

第7题:

He used to feel confident ( ) language ability.

A、in the term of

B、in terms of

C、in term of

D、in a term of


参考答案:B

第8题:

The earned value technique is a commonly used method of performance measurement.It integrates project scope,schedule,and cost measures to help the project management team assess project performance.If a project’s Cost Performance Index(CPI=EV/AC)value less than 1.0,it means that( )。 A.the cost savings for work completed B.the project is ahead of its planned schedule C.the cost overrun for work completed D.1ess work was completed than was planned


正确答案:C
挣值管理(EVM)是一种常用的绩效测量方法。它综合考虑项目范围、进度与成本指标,帮助项目管理团队评估项目绩效。如果某个项目的成本绩效指数(CPI=EV/AC)值小于1.0,则说明已完成的工作的成本超支(the cost overrun for work completed)。

第9题:

● The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index(SPI=EV/PV) value less than 1.0, it means that __(74)__.

(74)A.the project is ahead of its planned schedule

B.less work was completed than was planned

C.the cost overrun for work completed

D.the cost under-run of performance to date


正确答案:B

第10题:

A schedule is commonly used in project planning and project portfolio management.(73) on a schedule may be closely related to the work breakdown structure(WBS)terminal elements.the statement of work.or a contract data requirements list

A.Essences

B.Elements

C.Purposes

D. Issues


正确答案:B
本题目翻译:进度表是常用的项目规划和项目组合管理。按计划元素可能是密切相关的工作分解结构(WBS)的终端元素,工作的陈述,或合同数据要求清单。考察的是进度计划。