The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第1题:
A influenced ;
B influentially ;
C influence
第2题:
Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)
A. no single point of failure
B. trading database server location
C. redundant application servers location
D. deterministic response to all failures
E. determine which protocol to use
第3题:
In a contract, the point of total assumption refers to the point where:
A . The customer incurs the total financial responsibility for each additional dollar spent.
B . The contractor incurs the total financial responsiblity for each dollar spent.
C . The schedule and cost variance are zero.
D . The customer will incur no further costs for the work the contractor performs in the completion of the contract.
E . B and D only.
第4题:
Which prepare phase service component involves providing a customer with a financial justification for adopting a technology? Select exactly 1 answer(s) from the following:()。
第5题:
A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
第6题:
A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
A. 8 drive sets of 300 GB drives
B. 4 drive sets of 300 GB drives
C. 14 drive sets of 146 GB drives
D. 18 drive sets of 146 GB drives
第7题:
What are three project goals of a Technical Decision Maker? ()
第8题:
73 In a contract, the point of total assumption refers to the point where:
A. The customer incurs the total financial responsibility for each additional dollar spent.
B. The contractor incurs the total financial responsiblity for each dollar spent.
C. The schedule and cost variance are zero.
D. The customer will incur no further costs for the work the contractor performs in the completion of the contract.
E. B and D only
第9题:
What best explains why the banking industry is ready to take advantage of an integrated network infrastructure?()
第10题:
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()