A financial industry customer will consolidate their Intel-b

题目
单选题
A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services.  What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()
A

The technical specialist has supported multiple Cluster 1350 environments. References will be provided.

B

The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.

C

The technical specialist has worked on multiple UNIX consolidation projects.  References will be provided.

D

The technical specialist has worked on Linux consolidation efforts.  References will be provided.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

His method supports Mr Shiller's findings and has ________efforts to predict prices in the financial industry.

A influenced ;

B influentially ;

C influence


参考答案:A

第2题:

Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)

A. no single point of failure

B. trading database server location

C. redundant application servers location

D. deterministic response to all failures

E. determine which protocol to use


参考答案:A, D

第3题:

In a contract, the point of total assumption refers to the point where:

A . The customer incurs the total financial responsibility for each additional dollar spent.

B . The contractor incurs the total financial responsiblity for each dollar spent.

C . The schedule and cost variance are zero.

D . The customer will incur no further costs for the work the contractor performs in the completion of the contract.

E . B and D only.


正确答案:E

第4题:

Which prepare phase service component involves providing a customer with a financial justification for adopting a technology? Select exactly 1 answer(s) from the following:()。

  • A、Technology Strategy Development
  • B、High-Level Design Development
  • C、Business Case Development
  • D、Proof of Concept

正确答案:C

第5题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

  • A、8 drive sets of 300 GB drives
  • B、4 drive sets of 300 GB drives
  • C、14 drive sets of 146 GB drives
  • D、18 drive sets of 146 GB drives

正确答案:D

第6题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

A. 8 drive sets of 300 GB drives

B. 4 drive sets of 300 GB drives

C. 14 drive sets of 146 GB drives

D. 18 drive sets of 146 GB drives


参考答案:D

第7题:

What are three project goals of a Technical Decision Maker? ()

  • A、 ensuring network integrity
  • B、 controlling financial factors
  • C、 finding a solution that simplifies setup and operation
  • D、 understanding customer needs
  • E、 saving budget for future quarters
  • F、 providing offeringsthat are modular and can be built opon

正确答案:C,D,F

第8题:

73 In a contract, the point of total assumption refers to the point where:

A. The customer incurs the total financial responsibility for each additional dollar spent.

B. The contractor incurs the total financial responsiblity for each dollar spent.

C. The schedule and cost variance are zero.

D. The customer will incur no further costs for the work the contractor performs in the completion of the contract.

E. B and D only


正确答案:E

第9题:

What best explains why the banking industry is ready to take advantage of an integrated network infrastructure?()

  • A、 Many banks are still connecting via dial-up.
  • B、 Many banks need to consolidate departments and resources.
  • C、 Many banks find themselves with an obsolete branch infrastructure.
  • D、 Many banks need back-office process streamlining.

正确答案:C

第10题:

An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()

  • A、Share the data over the Ethernet LAN.
  • B、Install the IXA Adapter in the iSeries server.
  • C、Install the IXA Adapter in the xSeries server.
  • D、Attach both servers to an IXS switch.

正确答案:C

更多相关问题