动态获利性分析(dynamic Profitability Analysis)

题目
名词解释题
动态获利性分析(dynamic Profitability Analysis)
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

115 The technique most commonly used to determine the profitability of a project includes _____ methods.

A. Net present value (NPV).

B. Return on investment (ROI).

C. Discounted cash flow (DCF)

D. Payout time and risk sensitivity analysis.

E. All of the above


正确答案:E

第2题:

财务内部收益是反映项目(  )能力的(  )指标。

A.获利;静态
B.获利;动态
C.偿债;动态
D.偿债;动态

答案:B
解析:
财务内部收益是反映项目获利能力的动态指标。

第3题:

The profitability and technical data studies are provided in report format to owners and funders for acceptance. This type of report, used to solicit funding, is referred to as a(n) _____.

A . Project feasibility study.

B . Economic evaluation analysis.

C . Risk management manual.

D . Prospectus.

E . None of the above


正确答案:D

第4题:

如果某个链路伙伴的第2层接口模式被设置为dynamicauto,那么链路伙伴的接口模式应当如何设置才能建立干道()

  • A、干道(Trunk)
  • B、接入(Access)
  • C、非协商(Nonegotiate)
  • D、动态自动(Dynamic auto)
  • E、动态企望(Dynamic desirable)

正确答案:A,E

第5题:

财务内部收益率是反映项目 __________ 能力的 __________ 指标。( )

A:获利;静态
B:获利;动态
C:偿债:静态
D:偿债;动态

答案:B
解析:
财务内部收益率是反映项目获利能力的动态指标,故B符合题意。

第6题:

122 The profitability and technical data studies are provided in report format to owners and funders for acceptance. This type of report, used to solicit funding, is referred to as a(n) _____.

A. Project feasibility study.

B. Economic evaluation analysis.

C. Risk management manual.

D. Prospectus.

E. None of the above


正确答案:D

第7题:

The stages within the development phase of the software life cycle are( ).
软件生命周期开发阶段的阶段是

A.design,analysis,implementation,and testing
设计、分析、实现和测试
B.analysis,design,implementation,and testing
分析、设计、实现和测试
C.analysis,design,testing,and implementation
分析、设计、测试和实现
D.design,analysis,testing,and implementation
设计、分析、测试和实现

答案:B
解析:
属于软件生命周期中开发阶段的是分析、设计、实施和测试。

第8题:

The technique most commonly used to determine the profitability of a project includes _____ methods.

A . Net present value (NPV).

B . Return on investment (ROI).

C . Discounted cash flow (DCF)

D . Payout time and risk sensitivity analysis.

E . All of the above.


正确答案:E

第9题:

什么是静态评价(static evaluation)?什么是动态评价(dynamic evaluation)?它们各有哪些特点?


正确答案:静态评价是指利用(不考虑资金时间价值)静态指标对技术方案进行的评价。主要用于项目可行性研究初始阶段的粗略分析和评价。
动态评价考虑资金的时间价值,依据项目的一系列动态指标,对项目进行评价。
静态评价指标主要用于技术经济数据不完备和不精确的项目初选阶段,其特点是简单、直观、运用方便,但不够准确。
动态评价指标则用于项目最后决策前的可行性研究阶段,能全面反映资金的时间价值,并考察了项目在整个寿命期内收入与支出的全部经济数据。

第10题:

DYNAMIC SUPPORT 动态支撑技术的好处是?()

  • A、稳定
  • B、防止脚外翻
  • C、灵活
  • D、舒适

正确答案:A,B,D