increased capacity to set flooding boundaries
decreased capacity to set flooding boundaries
reduced compartmentation
greater deck load capacity
第1题:
In vessel construction,a greater number of watertight bulkheads results in ______.
A.increased capacity to set flooding boundaries
B.decreased capacity to set flooding boundaries
C.reduced compartmentation
D.greater deck load capacity
第2题:
After riveting is completed, the joints on the shell of a vessel are generally made watertight by________.
A.faying
B.caulking
C.felt or canvas packing
D.red lead
第3题:
The master is not bound to show in the bill of lading ______ of the goods shipped on board his vessel.
A.the number of packages
B.the number of weight
C.both the number of packages and of the weight
D.neither the number of the packages nor of the weight
第4题:
船体被划分为一系列水密隔舱。()
第5题:
In vessel construction, beam brackets are triangular plates that join the deck beam to a ____.
A.bulkhead
B.frame
C.stanchion
D.deck longitudinal
第6题:
In vessel construction,beams are transverse girders which provide support to ______.
A.Bulkheads
B.Deckhouse structures
C.Decks
D.Vertical frames
第7题:
An ocean tow is sinking in deep water. Attempts to sever the towing hawser are unsuccessful Which action should now be taken?______.
A.Abandon the towing vessel.
B.Radio for emergency assistance.
C.Slip the towline and allow it to run off the drum.
D.Secure all watertight openings on the towing vessel.
第8题:
A vessel cannot comply with all of the SOLAS requirements due to its construction. Where will this be indicated?
A.Nowhere; the vessel must comply to engage in international trade
B.On the reverse of the SOLAS certificate
C.On the Exemption Certificate
D.On the Certificate of Inspection
第9题:
Joiner bulkheads on a vessel provide ______.
A.compartmentalization
B.watertight integrity
C.structural support
D.tank boundaries
第10题:
What is the typical number of trunks in a Call Center?()