The final inspection responsibility for seeing that a tank b

题目
单选题
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().
A

terminal operator

B

owner of the barge

C

tankerman or person in charge of loading

D

charterer through the Master of the towing vessel

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Thomas: Hey, you look concerned.______

Jack: The final exam. I'm not fully prepared yet.

A、What a lovely day!

B、What has attracted you?

C、What's on your mind?

D、What about seeing the doctor?


参考答案:C

第2题:

Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by ______.

A.a marine chemist

B.the Officer in Charge,Marine Inspection

C.the Master or person in charge of the ship

D.the National Fire Protection Association


正确答案:C

第3题:

Random cause or system variation is:

A . generally present in every process

B . the responsibility of the inspection of the process

C . the responsibility of the workers of the process

D . the responsibility of management

E . A and D only


正确答案:E

第4题:

Cooper ative learning emphasizes on( ) and collective responsibility.

A、 solely responsibility
B、 teachers' responsibility

C、 individual responsibility
D、 team responsibility


答案:C
解析:
选C。合作学习既强调学生个人的责任,也重视集体的责任。

第5题:

When inspecting a tank barge to see that it has all the required fire extinguishers and other safety items aboard,which of the following is the best source for determining what is required?

A.The supervisor in charge of the dock to which the barge is tied up

B.Part 38 of the Rules and Regulations for Tank Vessels

C.The Certificate of Inspection of the barge

D.The local fire marshal


正确答案:C

第6题:

Which of the following denotes the FINAL point of responsibility for a service provider?()

A. 66 block

B. Patch panel

C. Wiring closet

D. Demarc


参考答案:D

第7题:

What is TRUE of pressure/vacuum valves?

A.They are designed to provide for the flow of small volumes of tank atmospheres caused by thermal variations in a cargo tank

B.They should operate in advance of the pressure/vacuum breakers

C.They should be kept in good working order by regular inspection and cleaning

D.All of the above


正确答案:D

第8题:

193 Random cause or system variation is:

A. generally present in every process

B. the responsibility of the inspection of the process

C. the responsibility of the workers of the process

D. the responsibility of management

E. A and D only


正确答案:E

第9题:

The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ______.

A.terminal operator

B.owner of the barge

C.tankerman or person in charge of loading

D.charterer through the Master of the towing vessel


正确答案:C

第10题:

Cooper ative learning emphasizes on( ) and collective responsibility.
A. solely responsibility B. teachers' responsibility
C. individual responsibility D. team responsibility


答案:C
解析:
选C。合作学习既强调学生个人的责任,也重视集体的责任。

更多相关问题