Minimum speed estimate
Maximum speed estimate
Average speed estimate
A running fix should not be used under these conditions
第1题:
()your request, we gave you an estimate of approximate requirements for next year.
A、For
B、At
C、By
D、Under
第2题:
A line of position derived by radar range from an identified point on a coast will be a(n) ______.
A.straight line
B.arc
C.parabola
D.line parallel to the coast
第3题:
()?
It includes merchandise, packaging and shipping, duty if required, any taxes and insurance.
A、 Could I get an estimate before placing an order
B、 What does the estimate include
C、 How many would you like to order
第4题:
第5题:
You are running parallel to the coast and take a running fix using bearings of the same object.If you are making less speed than used for the running fix,in relation to the position indicated by the fix,you will be ______.
A.Closer to the coast
B.Farther from the coast
C.On the track line ahead of the fix
D.On the track line behind the fix
第6题:
During planning you sit down and estimate the time needed for each task and total them to come up with the project estimate This duration is what you commit to complete the project. What is wrong with the scenario? ()
A.The team did not create the estimate and estimating tales too long using that method
B.The team did not create the estimate and a network diagram was not used
C.The estimate is too long and should be created by management
D.The project estimate should be the same as the customer's required completion date
第7题:
You are running parallel to the coast and estimate that the current is against you.In plotting a running fix using bearings from the same object on the coast,the greatest safety margin from inshore dangers will result if what speed is used to determine _______.
A.Minimum speed estimate
B.Maximum speed estimate
C.Average speed estimate
D.A running fix should not be used under these conditions
第8题:
Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings(环境)near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate(预算)must be corrected and revised(修订). His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high!) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
21. The best title of this passage is().
A. Building a House Costs Much Money
B. Estimate Is Important
C. Planning a House
22. The first thing for a person to build a house is().
A. to get as much money as possible
B. to find a suitable piece of land
C. to work out a plan
23. The phrase”draw a plan”in this passage means().
A. making a picture of a building or a room
B. making a plan
C. working out a plan
24. When the builder starts to build a house, his estimate will have to be corrected and revised because().
A. it is wrongly worked out by a workman
B. the future owner of the house thinks the estimate is so high that he cannot afford the building
C. the prices of building materials and the expenses(费用)of labor may be different from the original prices and expenses
25. What is the relationship(关系)between the estimate and the plan?
A. The plan depends on the estimate.
B. The plan has nothing to do with the estimate.
C. The estimate and the plan depend on each other.
21.
答案:C
解析:文章主要围绕建房子的顺序步骤:选土地、找建筑师、做预算等来展开的,故“Planning a House”符合题意。A、B两项概括不全面,只是文章内容的一部分。
22.
答案:B
解析:根据文中“Your first step will be to find a right piece of land.”可知,建房子的第一件事是要找到一块合适的土地。故选B。
23.
答案:A
解析:根据“draw a plan”后面的“It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.”可知,建筑师绘制的平面图具体包括房间的数量、位置、尺寸以及窗户、门、电插座等。故A项符合题意。
24.
答案:C
解析:根据文中“His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.”可知,预算是建立在现有价格上的,但是这些价格可能会变,而且在建筑师作出预算和建造房子之间可能会发生许多其他事情,故C项正确。
25.
答案:C
解析:根据文章最后一句“The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.”可知,预算与计划是相互依赖的。故C项正确。
第9题:
第10题: