In the process of the shafting management, special attention

题目
单选题
In the process of the shafting management, special attention should be paid to()
A

on the sailing, the water in the aft peak tank should be excluded as much as possible

B

the stuffing style ahead sealing shouldn’t have any water leaking out

C

Simplex astern sealing shouldn’t have any oil leaking out

D

Simplex ahead sealing can have some oil leaking out

参考答案和解析
正确答案: A
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The project charter is prepared in which scope management process?

A . Initiation

B . Scope planning

C . Scope Definition

D . Scope change control

E . Scope verification


正确答案:A

 

第2题:

___________ of teaching writing pays great attention to the accuracy of the final product but ignores the process.

A. The product-oriented method

B. The process-oriented method

C. The quality-oriented method

D. The test-oriented method


正确答案是:A

第3题:

To Miss Bean the most important thing for a student is to ________.

A. pay close attention to what the teacher says

B. learn to think and have one’s own idea

C. keep silent and unnoticed in class

D. get special attention from the teacher


正确答案:B

第4题:

__________method of teaching writing pays great attention to the accuracy of the finalproduct but ignores the process, which the students go through to reach the final goal.

A.Form-oriented
B.Product-oriented
C.Content-oriented
D.Process-oriented

答案:B
解析:
考查写作教学。重结果的教学模式对写作最后的成果十分重视,但是却忽视了对写作过程的监控,不利于写作能力的培养。

第5题:

The Develop Project Management Plan Process includes the actions necessary to define, prepare, integrate, and coordinate all constituent plans into a (75).

A.Project Scope Statement

B.Project Management Plan

C.Forecasts

D.Project Charter


正确答案:B

第6题:

Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.()process does not belong to Project Integration Management.

A.Developing project charter

B.Developing project management plan

C.Analyzing project risks

D.Monitoring and controlling project


正确答案:C

第7题:

Which background process of a database instance, using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?()

A. ASMB

B. PMON

C. RBAL

D.SMON


参考答案:A

第8题:

Which of the following is not a scope management process?

A . Initiation

B . Scope planning

C . Scope Definition

D . Scope change control

E . Scope verification


正确答案:D

第9题:

The Develop Project Management Plan Process includes the actions necessary to define, prepare,integrate, and coordinate all constituent plans into a ( )

A. Project Scope Statement
B.Project Management Plan
C.Forecasts
D.Project Charter

答案:B
解析:
项目管理的过程开发计划,包括采取必要的定义,准备,集成和协调所有组成计划到(75)。

A. 项目范围说明书 B. 项目管理计划

C. 项目预测 D. 项目章程

第10题:

The_______approach to writing teaching pays attention to not only what to write, but also how to write.

A.product-oriented
B.process-oriented
C.form-focused
D.meaning-focused

答案:B
解析:
考查写作教学模式。写作教学的模式通常有content-oriented approach(内容导向写作教学模式),pmcess—oriented approach(过程写作教学模式),product-oriented approach(结果导向写作教学模式)等。几种模式中,过程写作教学模式是将写作内容与过程并重的,故选B。

更多相关问题