general alarm and fire control plans
muster stations and duties of individual
patrol system
All of the above
第1题:
The third officer is ___ (负责)the fire-fighting equipment.
A.responsible
B.take charge of
C.in charge of
D.control
第2题:
第三组:
Ship recycling contributes to sustainable development and is the environmentally friendly way of disposing of ships with virtually every part of the hull, machinery, equipment, fittings and even furniture being re-used. However, while the principle of ship recycling is a sound one, the reported status of working practices and environmental standards in recycling facilities often leaves much to be desired. Such growing concerns about environmental safety, health and welfare matters in the ship recycling industry have resulted in a growing belief that an international instrument to regulate the ship recycling process is urgently needed.
Having become aware of the need to reduce the environmental, occupational health and safety risks related to ship recycling, as well as the need to secure the smooth withdrawal of ships that have reached the end of their operating lives, the International Maritime Organization (IMO) has taken action to develop a realistic and effective solution to the problem of ship recycling, which will take into account the particular characteristics of international maritime transport and the economic realities.
Which statement of the following is true?
A.Ship recycling is sustainable
B.Ship recycling is very friendly to our environment
C.Ship recycling is the best way to dispose the machinery, equipment, fittings and even furniture on board
D.Ship recycling brings many problems concerning environmental safety, health and______occupational safety
第3题:
The project scope/charter baseline includes:
A.Summary of background conditions defining the project.
B.Organization, authority and responsibility relationships.
C.Functions to be performed.
D.Resource requirement schedule including time estimates.
E.All of the above.
第4题:
The maintenance work for sailors includes ()(清洁), repairing and painting work on board a ship. 正确答案A
第5题:
For the purpose of the Rules, except where otherwise required, the term ______.
A.vessel includes seaplanes
B.seaplane includes non-displacement craft
C.vessel engaged in fishing includes a vessel fishing with trolling lines
D.vessel restricted in her ability to maneuver includes fishing vessels
第6题:
第一组:
When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.
Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.
When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the Administration
A.(1)
B.(2)
C.(3)
D.(1)(2)(3)
第7题:
The phrase VESSEL IN BALLAST usually means________.
A.the ship is fully loaded
B.the ship loaded with water
C.a ship with cargo
D.a ship with no cargo
第8题:
● The project scope/charter baseline includes:
A Summary of background conditions defining the project.
B Organization, authority and responsibility relationships.
C Functions to be performed.
D Resource requirement schedule including time estimates.
E All of the above.
第9题:
最大的货船是油轮。()
第10题:
Where do you post your ()(火势控制图)?