ballast tanks
sludge tanks
machinery space bilges
cargo hold bilges
第1题:
Accidental flooding of the engine room bilges by the bilge main is prevented by( ).
A.stop-check valves installed in the bilge suction manifolds
B.using a positive displacement reciprocating bilge pump
C.installing educators in all bilge rose boxes
D.installing a swing check before each bilge valve
第2题:
Which two statements are tru e about the rendezvous point (RP) in a multicast network?()
第3题:
4 (a) ISA 701 Modifications to The Independent Auditor’s Report includes ‘suggested wording of modifying phrases
for use when issuing modified reports’.
Required:
Explain and distinguish between each of the following terms:
(i) ‘qualified opinion’;
(ii) ‘disclaimer of opinion’;
(iii) ‘emphasis of matter paragraph’. (6 marks)
第4题:
add strength to the bilge well strainer
permit rapid flow of water to the bilge wells
prevent cargo sifting into the bilge wells
prevent oil,water,or other liquid from reaching the cargo
第5题:
Which two statements are true about the rendezvo us point (RP) in a multicast network?()
第6题:
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited ________.
A.It is required on all vessels
B.It may be located in a conspicuous place in the wheelhouse
C.It may be located at the bilge and ballast pump control station
D.All of the above
第7题:
污水井()
第8题:
5 (a) ‘In the case of an assurance engagement it is in the public interest and, therefore, required by this Code of Ethics,
that members of assurance teams … be independent of assurance clients’.
IFAC Code of Ethics for Professional Accountants
Required:
Define the term ‘assurance team’. (3 marks)
第9题:
primarily to lubricate the shaft seals
due to the inability of this type of pump to lift water to cover the suction (eye) of the impeller
to initially unload the pump by having its head pressure equal to discharge pressure
in order to overcome the potential energy of water in the discharge line
第10题:
strainers
valves
elements
separators