Bypass the after-cooler to operate at speed
Run at reduced speed until the cooler can be repaired or renewed
Switch to diesel fuel and run at full speed
Nothing need to be done due to the low heating value of heavy fuel
第1题:
When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?
A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosion
B.The stern bearing alignment with the stern frame should be checked
C.The interior of the stern tube should be inspected for leaks
D.The shaft liner should be removed and inspected for cracks
第2题:
A.Veryoff the volume group
B.Unmount any filesystems on the disk
C.Remove all physical partitions on the disk
D.Unmount mirrored filesystems from the disk
第3题:
(b) Describe the principal audit procedures to be carried out in respect of the following:
(i) The measurement of the share-based payment expense; (6 marks)
第4题:
Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()
第5题:
第6题:
A.chdev
B.reboot
C.lpstat -Q
D.smit install
第7题:
Preventive maintenance______.
A.should not be carried out during the watches
B.can only be carried out in port
C.is a kind of maintenances carried out prior to the occurrence
D.is a kind of maintenances carried out after the occurrence
第8题:
(ii) Recommend further audit procedures that should be carried out. (4 marks)
第9题:
Which of the following safety procedures is the BEST when lifting heavy equipment onto a repairbench?()
第10题:
In a three-disk volume group, a disk was physically removed from the system without performing any software procedures to properly remove the disk. Which of the following commands should be performed to recover from this error?()