at all wearing points of mooring lines
at the bitter ends of all standing rigging
around running rigging
on wire rope only
第1题:
A storm is forecast for the area where your vessel is moored. For its safety you should put ______.
A.more slack in the mooring lines
B.a strain on the mooring lines
C.chafing gear on the mooring lines
D.grease on the mooring lines
第2题:
Chafing gear should be placed______.
A.at all wearing points of mooring lines
B.around running rigging
C.on wire rope only forces
D.at the bitter ends of all standing rigging
第3题:
A spur gear pump should be operated with the discharge valves ______.
A.slightly opened
B.throttled
C.fully opened
D.halfway opened
第4题:
Enforcement of smoking restrictions
Restricting vessels from coming alongside the barge
Insuring that a combustible gas indicator is aboard
Protecting cargo hose with chafing gear
第5题:
Cribbing is ______.
A.wooden blocks or dunnage placed between a deck load and the deck
B.the chains and shackles used to secure a deck cargo
C.a crate in which a deck cargo is packaged
D.cardboard separation pieces placed between deck loads to prevent chafing
第6题:
Chafing gear ______.
A.reduces and prevents corrosion of standing rigging
B.prevents corrosion of running rigging
C.reduces and prevents wear caused by the rubbing of one object against another
D.protects the body against extreme cold
第7题:
Chafing gear(防摩擦装置) is used to______.
A.anchor the boat
B.pick up heavy loads
C.protect fiber rope from abrasion
D.strengthen mooring lines
第8题:
Before putting on the starting air, the reversing and control gear should be _____.
A.operated
B.stopped
C.checked
D.removed
第9题:
In which of the following configurations should a SAS hard drive jumper be placed for single drive operation?()
第10题:
The jumpers should be placed in the single/master position.
There are no configuration jumpers needed on a SAS hard drive.
The jumpers should be placed to give the drive a SCSI ID of 1.
The jumpers should be placed in the slave position.