系缆桩
控制器
起货机
吊杆
第1题:
Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .
第2题:
If there is another line already on the bollard ,the eye of the second line should be()before placing it over the bollard.
第3题:
下列属于世界货币基金组织发展委员会成员的有()
A.Laurent FABIUS,France
B.Alan Bollard, New Zealand
C.XIANG Huaicheng,China
D.Clare SHORT,United Kingdom
第4题:
displacement
stability
towrope pull
propeller design
第5题:
系缆桩
控制器
起货机
吊杆
第6题:
Keep clear of the ()!
第7题:
bollard()
第8题:
If two mooring lines are to be placed on the same bollard,which method is BEST?______.
A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first
B.It makes no difference how the lines are placed
C.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard
D.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch
第9题:
the eye of the second line is dipped
the mooring lines are doubled
the bollard has two horns
one of the lines is a breast line
第10题:
indicated horsepower,bollard pull,and displacement
indicated horsepower,maneuverability,and displacement
indicated horsepower,bollard pull,and maneuverability
bollard pull,displacement,and maneuverability