第1题:
145 Risks that cannot be identified or evaluated _____ .
A. should be deflected to the contracting officer.
B. should be handled via contingency allowances.
C. should be ignored, since they cannot be identified.
D. should be ignored, since they are not covered in the Risk Assessment.
E. C and D
第2题:
Duty sailors will consider the conditions of (装卸货)______.
A.cargo handled
B.cargo handles
C.cargo handle
D.cargo handling
第3题:
Risks that cannot be identified or evaluated _____ .
A should be deflected to the contracting officer.
B should be handled via contingency allowances.
C should be ignored, since they cannot be identified.
D should be ignored, since they are not covered in the Risk Assessment.
E C and D
第4题:
deck cargo ()
第5题:
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.
A.Cargo has been loaded or discharged
B.Cargo hose is connected
C.Cargo pumps are started
D.Vessel is ready to handle cargo
第6题:
Never______stowed like this.
A.optional cargo should be
B.should optional cargo be
C.should be optional cargo
D.optional cargo must be
第7题:
Cargo on deck,plants and live animals are usually received,handled,carried,kept and discharged at ______.
A.Carrier’s risk
B.Owner’s risk
C.Merchant’s risk
D.Charterer’s risk
第8题:
Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):
A should be deflected to the contracting officer
B should be handled via contingency allowances
C should be ignored, since they cannot be identified
D should be ignored, since they are not covered in the Project Risk Assessment
E C and D