Refer to the exhibit. At the end of an RSTP election process

题目
单选题
Refer to the exhibit. At the end of an RSTP election process, which access layer switch port will assume the discarding role?()
A

Switch3, port fa0/1

B

Switch3, port fa0/12

C

Switch4, port fa0/11

D

Switch4, port fa0/2

E

Switch3, port Gi0/1

F

Switch3, port Gi0/2

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Refer to the exhibit. Which of the following statements is true? ()

A. BGP NSF awareness is enabled

B. SSO for BGP NSF capability is enabled

C. BGP graceful restart awareness is enabled

D. 10.11.1.187 is configured as an NSF-capable BGP neighbor


参考答案:A

第2题:

Refer to the exhibit. Which command would verify if PBR reacts to packets sourced from 172.16.0.0/16?()

A. show ip route

B. show policy - map

C. show access - lists

D. show route - map


参考答案:D

第3题:

(c) Discuss the ways in which budgets and the budgeting process can be used to motivate managers to

endeavour to meet the objectives of the company. Your answer should refer to:

(i) setting targets for financial performance;

(ii) participation in the budget-setting process. (12 marks)


正确答案:
(c) Examiner’s Note:
The topic of managerial motivation and budgeting has been a subject of discussion for a number of years. There are links
here to the topics of performance measurement and responsibility accounting. Discussion should be focused on the area of
budgets and the budgeting process, as specified in the question.
Setting targets for financial performance
It has been reasonably established that managers respond better in motivation and performance terms to a clearly defined,
quantitative target than to the absence of such targets. However, budget targets must be accepted by the responsible
managers if they are to have any motivational effect. Acceptance of budget targets will depend on several factors, including
the personality of an individual manager and the quality of communication in the budgeting process.
The level of difficulty of the budget target will also influence the level of motivation and performance. Budget targets that are
seen as average or above average will increase motivation and performance up to the point where such targets are seen as
impossible to achieve. Beyond this point, personal desire to achieve a particular level of performance falls off sharply. Careful
thought must therefore go into establishing budget targets, since the best results in motivation and performance terms will
arise from the most difficult goals that individual managers are prepared to accept4.
While budget targets that are seen as too difficult will fail to motivate managers to improve their performance, the same is
true of budget targets that are seen as being too easy. When budget targets are easy, managers are likely to outperform. the
budget but will fail to reach the level of performance that might be expected in the absence of a budget.
One consequence of the need for demanding or difficult budget targets is the frequent reporting of adverse variances. It is
important that these are not used to lay blame in the budgetary control process, since they have a motivational (or planning)
origin rather than an operational origin. Managerial reward systems may need to reward almost achieving, rather than
achieving, budget targets if managers are to be encouraged by receiving financial incentives.
Participation in the budget-setting process
A ‘top-down’ approach to budget setting leads to budgets that are imposed on managers. Where managers within an
organisation are believed to behave in a way that is consistent with McGregor’s Theory X perspective, imposed budgets may
improve performance, since accepting the budget is consistent with reduced responsibility and avoiding work.
It is also possible that acceptance of imposed budgets by managers who are responsible for their implementation and
achievement is diminished because they feel they have not been able to influence budget targets. Such a view is consistent
with McGregor’s Theory Y perspective, which holds that managers naturally seek responsibility and do not need to be tightly
controlled. According to this view, managers respond well to participation in the budget-setting process, since being able to
influence the budget targets for which they will be responsible encourages their acceptance. A participative approach to
budget-setting is also referred to as a ‘bottom-up’ approach.
In practice, many organisations adopt a budget-setting process that contains elements of both approaches, with senior
management providing strategic leadership of the budget-setting process and other management tiers providing input in terms
of identifying what is practical and offering detailed knowledge of their area of the organisation.

第4题:

Refer to the exhibit. What is the most appropriate summarization for these routes?()

A.10.0.0.0/21

B.10.0.0.0/22

C.10.0.0.0/23

D.10.0.0.0/24


参考答案:B

第5题:

Refer to the exhibit. Which two statements about the topologies shown are correct?()

A. Design 1 is a looped triangle design.

B. Design 2 is a looped triangle design.

C. Design 2 achieves quick convergence using RSTP.

D. Both designs supportstateful services at the aggregation layer.

E. Design 2 is the most widely deployed in enterprise data centers.


参考答案:A, D

第6题:

Refer to the exhibit. The routing protocols EIGRP and OSPF have been configured as indicated in the exhibit. Given the partial configuration of router R2, which network will be present in th e routing table of R4?()

A. Network B

B. Network A and Network B

C. Network A

D. neither Network A nor Network B


参考答案:A

第7题:

Refer to the exhibit. Router B is performing bidirectional redistribution between EIGRP an d OSPF.The network 10.100.1.0/24 should not be reachable from the 10.100.9.0/24 network. However, it needs to be reachable from any network within the EIGRP domain. All other networks should be seen in both domains. Which change to router B would accom plish these goals?()

A. Under the EIGRP process, insert the distribute - list block_net_1 out ospf 1 command.

B. Under the OSPF process, insert the distribute - list block_net_1 in serial1/0 command.

C. Under the EIGRP process, insert the distribute - list block_net_1 in serial1/0 command.

D. Under the OSPF process, insert the distribute - list block_net_1 out eigrp 1 command.


参考答案:D

第8题:

Refer to the exhibit. You have a non-Cisco switch that is not communicating properly while connected to the distribution-layer Cisco switching fabric.Which two best-practice actions can you take to overcome this problem? ()(Choose two.)

A. Turn off MST (802.1s) on all switches.

B. Turn on MST (802.1s) on all switches.

C. Turn on RSTP (802.1w) on all switches.

D. Turn off RSTP (802.1w) on all switches.


参考答案:B, D

第9题:

Which three statements about RSTP are true?()

A. RSTP significantly reduces topology reconverging time after a link failure.

B. RSTP expends the STP port roles by adding the alternate and backup roles.

C. RSTP port atates are blocking,discarding,learing,or forwarding.

D. RSTP also uses the STP proprsal-agreement sequence.

E. RSTP use the same timer-baseed process as STP on point-to-point links.

F. RSTP provides a faster transition to the forwarding state on point-to-point links than STP does.


参考答案:A, B, F

第10题:

Refer to the exhibit. Which subnet mask will place all hosts on Network B in the same subnet with the least amount of wasted addresses?()

A.255.255.255.0

B.255.255.254.0

C.255.255.252.0

D.255.255.248.0


参考答案:B