MIB
FIB
LDAP
CEF
第1题:
The Simple Network Management Protocol(SNMP)is an(66)protocol that facilitates the exchange of management information between(67). It is part of the Transmission Control Protocol/Internet Protocol(TCP/IP)protocol suite. SNMP enables network(68)to manage network performance, find and sole network problems, and plan for(69)An SNMP -managed network consists of three key components: managed devices ,(70),and network -management systems .
A.Physical Layer
B.Link Layer
C.Network Layer
D.Transport Layer
第2题:
Estimating schedule activity costs involves developing an(4)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. For example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. The cost estimating process considers whether the expected savings can offset the cost of the additional design work. Cost estmates are generally expressed in units of(5)to facilitate comparisions both within and across projects. The(6)describes important information about project requirement that is considered during cost estimating.
A.accuracy
B.approxination
C.specification
D.summary
第3题:
An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?
A.Total float for the activity is 9 days.
B.The early finish date ofthe activity is the end ofthe day on the 14th.
C.The late finish date is the 25th.
D.The activity can be completed in 2 days ifthe resources devoted to it are doubled.
第4题:
第5题:
A. It uses SNMP v1.
B. It scans devices for hardware information.
C. It scans and records the operational status of devices.
D. When the configuration of a device changes, the inventory is automatically updated.
第6题:
Estimating schedule activity costs involves developing an (74) of the cost of the resources needed to complete each schedule activity.
A.accuracy
B.approximation
C.specification
D.summary
第7题:
devices take information people can understand and convert them to a form the computer can process
A.Input
B.Output
C.I/O
D.Disk
第8题:
Rate your level of proficiency with managing and maintaining physical and logical devices, includingmanaging basic and dynamic disks; monitoring server hardware; optimizing server disk performance; andinstalling, configuring, and troubleshooting server hardware devices. ()
A. I am considered an expert on this. I have successfully done this multiple times without assistance or error. I train or supervise others on this activity. Others come to me when they have questions or need assistance with this.
B. I have successfully done this without assistance and with few errors, but I do not train or supervise others on this activity.
C. I am proficient at this. I have successfully done this on my own, but I occasionally require assistance for some types of problems encountered when doing this and/or occasionally make minor errors.
D. I have successfully done this with the assistance of others or specific instructions.
E. I am a novice. I have not done this yet or I am learning.
第9题:
I shall define him as an individual who has elected as his primary duty and pleasure in life the activity of thinking in Socratic(苏格拉底) way about moral problems .
第10题: