单选题Which are the two main uses of a VIO server?()A Virtualize network and memory to LPARs.B Virtualize network and storage to LPARs.C Virtualize memory and processors to LPARs.D Virtualize storage and processors to LPARs.

题目
单选题
Which are the two main uses of a VIO server?()
A

Virtualize network and memory to LPARs.

B

Virtualize network and storage to LPARs.

C

Virtualize memory and processors to LPARs.

D

Virtualize storage and processors to LPARs.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You are evaluating the deployment of a Hyper-V server that will host 10 VMs. Each VM will have the following configurations: - 8 GB of memory  - Two virtual processors - One 200-gigabit fixed VHD - Two virtual network adapters  You need to recommend changes to the standard server build to support the planned deployment. Which hardware components should be changed?()

  • A、networking
  • B、processor
  • C、memory
  • D、storage

正确答案:C

第2题:

A 4-way x445 server with 2GB of memory running Windows 2003 Server with Exchange 2003 is performing poorly.  Users are complaining of slow response times when accessing their email.  Which subsystem should be checked first as a potential bottleneck?()

  • A、Processors
  • B、Memory subsystem
  • C、Storage subsystem
  • D、Network connectivity

正确答案:B

第3题:

Which are the two main uses of a VIO server?()

A.Virtualize network and memory to LPARs.

B.Virtualize network and storage to LPARs.

C.Virtualize memory and processors to LPARs.

D.Virtualize storage and processors to LPARs.


参考答案:B

第4题:

A customer needs a new database server.  The database application has a high memory overhead but does not benefit from 8-way processing.  They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory.  Which of the following will satisfy the customer’s requirements?()

  • A、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
  • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
  • C、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
  • D、x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory

正确答案:C

第5题:

A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()

  • A、IBM i Edition
  • B、Express Edition
  • C、Standard Edition
  • D、Enterprise Edition

正确答案:C

第6题:

A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

  • A、PowerVM offers partition mobility.
  • B、PowerVM can virtualize network and SAN resources.
  • C、PowerVM supports multiple operating systems running concurrently.
  • D、PowerVM allows an LPAR to use activated cores and memory without limitation.

正确答案:D

第7题:

A customer needs a new Microsoft Windows 2003 Server.  They are running an application that requires substantial memory.  They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache.  Which of the following is the minimum configuration to satisfy the customer’s requirements?()

  • A、x445 with four Xeon MP processors and 8GB of memory
  • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
  • C、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
  • D、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory

正确答案:A

第8题:

You are evaluating the deployment of a Hyper-V host named Host1 that will host 10 VMs. Each VM will have the following configurations: - 10 GB of memory - Two virtual processors - One 300-gigabit fixed VHD - Two virtual network adapters  You need to recommend changes to the standard server build to support the planned deployment. Which hardware components should be changed?()

  • A、processor
  • B、storage
  • C、memory
  • D、networking

正确答案:C

第9题:

A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()

  • A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
  • B、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.
  • C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.
  • D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.

正确答案:C

第10题:

Which are the two main uses of a VIO server?() 

  • A、Virtualize network and memory to LPARs.
  • B、Virtualize network and storage to LPARs.
  • C、Virtualize memory and processors to LPARs.
  • D、Virtualize storage and processors to LPARs.

正确答案:B

更多相关问题