Initiate LPAR fallover to backup systems.
Use Live Partition Mobility to move the LPARs to other systems.
Use Live Application Mobility to move critical applications to alternate systems.
Back up all LPARS to a NIM server and restore them to other LPARs on other systems.
第1题:
An administrator has a single 14U rack. The administrator needs to install fifteen servers; rack-mounted redundant uninterruptible power supplies (UPSs), a network switch, and a KVM. Which of the following server types would be BEST suited for this scenario?()
第2题:
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()
第3题:
A.InitiateLPARfallovertobackupsystems.
B.UseLivePartitionMobilitytomovetheLPARstoothersystems.
C.UseLiveApplicationMobilitytomovecriticalapplicationstoalternatesystems.
D.BackupallLPARStoaNIMserverandrestorethemtootherLPARsonothersystems.
第4题:
A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio. Which IBM server will fit the best for this customer?()
第5题:
While installing the equipment for a new two-node cluster, it is discovered that the disk subsystem Rack has one connection to the power mains. The explanation given was that the disks are to be mirrored between the two disk drawers in the rack and that a failure in either of the disk drawers would simply result in half of the disk being lost. What can be done to avoid a single point of failure?()
第6题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第7题:
A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()
第8题:
A customer has a p650 on order and plans to put it in a current OEM rack. They are concerned that the p650 power supply may demand more current than the OEM PDU can provide. Which planning guide specification would provide the necessary requirements?()
第9题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第10题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()