单选题Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A APV, AIX5.2ML4B AIX5.3 or i5/OSC APV, i5/OS, AIX5.3D APV, AIX5.3 o

题目
单选题
Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()
A

APV, AIX5.2ML4

B

AIX5.3 or i5/OS

C

APV, i5/OS, AIX5.3

D

APV, AIX5.3 or SuSE9

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()

  • A、APV, AIX5.2ML4
  • B、AIX5.3 or i5/OS
  • C、APV, i5/OS, AIX5.3
  • D、APV, AIX5.3 or SuSE9

正确答案:D

第2题:

Which tool must be used to analyze all of the database operations performed by an application against a DB2 for i5/OS database?()

  • A、Visual Explain
  • B、Activity Monitor
  • C、SQL Performance Monitor
  • D、DB2 Performance Monitor

正确答案:C

第3题:

Companycomhasarequirementtoconsolidatesixwebapplicationservers.Thereisunusedcapacityof2CPUsontheirnewp5570.Whichoperatingsystemsandorfeaturesarerequired?()

A.APV,AIX5.2ML4

B.AIX5.3ori5/OS

C.APV,i5/OS,AIX5.3

D.APV,AIX5.3orSuSE9


参考答案:D

第4题:

The system administrator at a university has many stand-alone machines and wants to consolidate them, minimizing the amount of time to upgrade all of the operating systems. Which of the following solutions supports the requirement?()

  • A、Micro-partitions
  • B、Logical Partitions
  • C、Dynamic Partitions
  • D、Workload Partitions

正确答案:D

第5题:

Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC. What is the probable cause?()

  • A、APV key is not registered
  • B、Networking and DNS are not configured
  • C、/etc/hosts table on HMC is not configured
  • D、Virtual IO Server dose not support DLPAR

正确答案:B

第6题:

Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()

  • A、A 24 way p5 595 with 3 LPARs
  • B、A 24 way p5 595 with 2 LPARs
  • C、One p5 570s 16 way and one p5 570 8 way
  • D、One p5 595 12 way active and 12 way inactive, and one p5 570 8 way

正确答案:C

第7题:

APV


正确答案:调整后净现值,是跨国投资项目经济评价指标。投资项目经济评价的基本指标是净现值和内部收益率。但在国际投资决策会计中,监于跨国投资项目的特殊要求,以跨国公司总公司为主体进行经济评价,应将净现值指标转化为调整后的净现值指标。

第8题:

Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()

  • A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. 
  • B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. 
  • C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.  
  • D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.

正确答案:D

第9题:

Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() 

  • A、APV features are not supported for some legacy POWER4 adapters
  • B、APV will require the most current maintenance level for AIX 5.2
  • C、APV features will require that legacy POWER4 adapters be updated with new microcode
  • D、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

正确答案:A

第10题:

Which of the following DB2 products are required on an iSeries or System i server to enable an application running on that server to retrieve data from a DB2 database on a Linux server?()

  • A、DB2 for i5/OS
  • B、DB2 Runtime Client
  • C、DB2 Connect Enterprise Edition
  • D、DB2 for i5/OS SQL Development Kit

正确答案:A

更多相关问题