Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
Smallest partition one processor, as small 1% of a processor may be transferred.
Smallest partition one core, as small 10% of a processor may be transferred.
第1题:
When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()
第2题:
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
第3题:
An administrator analyzes a poorly performing system and suspects that the issue is related to CPU resource. Upon reviewing output of vmstat, the administrator is concerned with the values in the ‘pc’ and ‘ec’ columns.Which definition describes these two headings?()
A.‘pc‘ refers to the number of physical processors consumed, while ‘ec‘ refers to the percentage of entitled capacity consumed.
B.‘pc‘ refers to the ‘physical CPUs‘ and lists how many are left un-allocated, while ec‘ refers to the ‘entitled CPUs‘ and lists what amount is currently allocated to the LPAR.
C.‘pc‘ refers to the ‘processor count‘ and reflects how many CPUs are allocated to the LPAR, while ‘ec ‘ refers to the ‘extra capacity‘ and lists how much above the LPAR entitlement is being consumed.
D.‘pc‘ refers to ‘processor cards‘ and reflects how many MCM modules are actually being used by this LPAR, while ‘ec‘ refers to the ‘entitled CPUs‘and lists what amount is currently allocated to the LPAR.
第4题:
A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()
第5题:
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
第6题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第7题:
A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()
第8题:
Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities? Select exactly 1 answer(s) from the following:()。
第9题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第10题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()