Implement PowerHA SystemMirror on both VIO servers.
Configure Etherchannel between the client LPARs and the two VIO servers
Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.
Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
第1题:
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
第2题:
What restrictions apply to using virtual Ethernet within a cluster containing VIO clients?()
第3题:
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()
A.A VIO server requires a dedicated LHEA port.
B.There is a limit of 32 LPARs per virtual LAN.
C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
第4题:
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
第5题:
A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs to reduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Which technology is recommended for this proposal?()
第6题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第7题:
LPAR1 is configured to have the same 2 LUNs virtualized by a redundant pair of VIO servers. Which command will validate that both storage paths are available?()
第8题:
A.When managing more than four VIO servers.
B.When installed with Power 570 and larger hardware.
C.When hosting both Linux and AIX on the same physical hardware.
D.When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.
第9题:
Which of the following is a situation where dual (redundant) HMCs are recommended()?
第10题:
Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()