Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
第1题:
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
第2题:
Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()
第3题:
When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()
第4题:
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
第5题:
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
第6题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第7题:
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
第8题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第9题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第10题:
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()