A customer plans to consolidate two 8-core POWER6 systems wi

题目
单选题
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
A

Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.

B

Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.

C

Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.

D

Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()

  • A、Is the web content static or dynamic information 
  • B、Consider two servers for redundancy and failover 
  • C、What is the average CPU utilization of the existing web servers 
  • D、Will the servers need a SCSI or Fibre Channel storage solution

正确答案:B

第2题:

A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()

  • A、add one SVC
  • B、install one DS8700
  • C、install one DS8800
  • D、install one XIV system

正确答案:C

第3题:

A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()

  • A、 PowerVM Lx86
  • B、 PowerVM Express Edition
  • C、 PowerVM Standard Edition
  • D、 PowerVM Enterprise Edition

正确答案:C

第4题:

Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()

  • A、LPAR Validation Tool (LVT)
  • B、Personal Systems Configurator (PSC)
  • C、IBM Configuration for eBusiness (eConfig)
  • D、Advanced System Management Interface (ASMI)

正确答案:A

第5题:

A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility.  What other product is required to accomplish this objective? ()

  • A、 HACMP for AIX
  • B、 PowerVM Enterprise Edition
  • C、 IBM Management Edition for AIX
  • D、 Workload Partition Manager for AIX

正确答案:D

第6题:

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()

  • A、What are the plans for Disaster Recovery? 
  • B、What are the plans for data migration? 
  • C、Would iSCSI meet your needs? 
  • D、How much space is available in the current storage systems?

正确答案:B

第7题:

Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()

  • A、The systems must use internal storage for boot purposes. 
  • B、All virtualized ethernet adapters must be numbered below 10. 
  • C、The mobile partition's network and disk access must be virtualized. 
  • D、Each system must be controlled by a different Hardware Management Console (HMC). 

正确答案:C

第8题:

A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()

  • A、Because additional systems would require more power receptacles
  • B、Because the customer may need to do additional facilities planning
  • C、Because the customer needs additional funding to cover the services
  • D、Because postponing the eventual discussion will likely lead to customer dissatisfaction

正确答案:D

第9题:

A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

  • A、 vmstat and iostat data from the older machines 
  • B、 The number of CPUs that were installed in the original machines 
  • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
  • D、 Performance data that is collected from the new system after it has been put into production

正确答案:C

第10题:

A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used.  Which solution best meets the specified requirements()

  • A、two DS8700 systems with two-way processor cards and 600 GB FC drives
  • B、two DS8700 systems with four-way processor cards and LPAR
  • C、two DS8700 systems with two-way processor cards and two frames per system
  • D、two DS8700 systems with four-way processor cards and two frames per system

正确答案:D

更多相关问题