单选题Scheduled preventative maintenance visits should be carried out:()A after two unplanned service calls.B according to manufacturers specifications.C when the device is becoming unreliable.D every sixty days.

题目
单选题
Scheduled preventative maintenance visits should be carried out:()
A

after two unplanned service calls.

B

according to manufacturers specifications.

C

when the device is becoming unreliable.

D

every sixty days.

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

If passengers are on board when an abandon ship drill is carried out,they should ______.

A.take part

B.watch

C.go to their quarters

D.stay out of the way and do what they want


正确答案:A

第2题:

()should be greased every month or two and it should be kept on a reel when not in use.

  • A、Wire rope
  • B、Hemp rope
  • C、Nylon rope
  • D、Wooden rope

正确答案:A

第3题:

Every possible test () to decide the nature of her illness.

A、carries out

B、carried out

C、was carried out

D、has carried out


参考答案:C

第4题:

When is it advisable to dump the waste toner from a technicians service vacuum?()

  • A、When it is full.
  • B、It is not recommended.
  • C、Before performing preventative maintenance.
  • D、After each call.

正确答案:B

第5题:

You are the network administrator for All network servers run Windows Server 2003. Recently, another network administrator create a scheduled task to perform a normal backup of Microsoft Exchange Server 2003 compuer every Saturday night. You need to perform maintenance tasks on the Exchange server on this Saturday night only. If the backup starts while you are performing the maintenance tasks,data might be corrupted. You need to ensure that the backup task does not start while you perform the maintenance tasks. What are two possible ways to achieve this goal? (Each correct answer presents a complete solution.()Choose two.)

  • A、In the Backup utility, clear the Enabled (scheduled tasks runs at specified time) check box.
  • B、In Control Panel, use Scheduled Tasks to pause Task Scheduler.
  • C、Run the Schtasks command with the /end /p parameters.
  • D、Use the Services snap-in to change the startup type of the Task Scheduler service from Automatic to Manual.

正确答案:A,B

第6题:

Which of the following about teaching assessment is inappropriate?

A.Diagnostic assessment is a kind of test carried out after a teaching activity.
B.Formative assessment should be student-oriented.
C.Summative assessment is often carried out at the end of a term.
D.Portfolios,daily reports,and delivering speeches are all formative assessment.

答案:A
解析:
翻译:下面哪个关于教学评价的说法是不合适的呢?A:诊断评价是一种教学活动后进行的测试。
B:形成性评价应该学生为本。
C:总结性评价通常是在学期末。
D:作品集、每日报告、演讲都是形成性评价。
此题考查教学评价。诊断性评价是指在某项教学活动开始之前对学生的知识、技能及情感等状况进行的预测,而不是在教学活动之后进行,故A项错误。

名师如何巧解题?查看视频解析>>

第7题:

Scheduled preventative maintenance visits should be carried out:()

  • A、after two unplanned service calls.
  • B、according to manufacturers specifications.
  • C、when the device is becoming unreliable.
  • D、every sixty days.

正确答案:B

第8题:

Preventive maintenance______.

A.should not be carried out during the watches

B.can only be carried out in port

C.is a kind of maintenances carried out prior to the occurrence

D.is a kind of maintenances carried out after the occurrence


正确答案:C

第9题:

As a best practice, when should the server be rebooted to apply the reboot required patches?()

  • A、During scheduled downtime
  • B、Once a year
  • C、As soon as the patches are finished installing
  • D、At the same time every day

正确答案:A

第10题:

Which two statements are true with respect to the maintenance window?() .

  • A、 A DBA can enable or disable an individual task in all maintenance windows.
  • B、 A DBA cannot change the duration of the maintenance window after it is created.
  • C、 In case of a long maintenance window,all Automated Maintenance Tasks are restarted every four hours.
  • D、 A DBA can control the percentage of the resource allocated to the Automated Maintenance Tasks in each window

正确答案:A,D

更多相关问题