问题:单选题A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A TSMB PSSPC WebSMD LoadLeveler
查看答案
问题:单选题Which of the following is a benefit of having a Solution Assurance?()A The need to involve solution experts is removedB Financial justification of the proposal is enhancedC Time required to design a solution is decreasedD Complex solutions are simplified considerably
问题:单选题A customer has six model H70s with dual processors and needs to reduce the current complexity of managing the systems. Which of the following solutions should be recommended?()A Six 2-way p610B 8-way p670 with six LPARsC 8-way p630 with six LPARsD Three p615s with two LPARs each
问题:单选题Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()A AIX V5.2B AIX V4.2C AIX V4.3D AIX V5.1
问题:单选题Which of the following statements best describes a Pre-sales Solution Assurance Review?()A An account team proposal reviewB An installation planning meetingC A solution design development methodologyD A technical inspection of a completed solution design
问题:单选题Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()A ATMB EthernetC SP Switch2D Fibre Channel
问题:单选题What other type of document accompanies the SAPR Guide to provide guidelines and pointers for use during Pre-Sale Reviews? ()A TechdocsB Process GuideC Product ChecklistsD Site Planning Guide
问题:单选题In addition to better overall price performance, which other factor most significantly contributes to a lower three-year TCO advantage for a pSeries customer than for a SUN customer?()A Sharing commonly used peripheralsB Maximum capacity of CPU, Memory and I/OC Minimum number of processors in a partitionD Support for different versions of the operating system
问题:单选题An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()A p630. Maximum partitions, maximum storage, I/O bus speedB p670. Maximum partitions, maximum memory, number of I/O slotsC p655. Maximum number of CPUs, processor speed, number of I/O slotsD p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth
问题:单选题An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()A IBM pSeries servers support Oracle on both POWER4 and ItaniumB AIX has Itanium affinity with any ISV application including OracleC Oracle and thousands of other ISV applications are already available for AIX on pSeriesD IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution
问题:单选题When is the most appropriate time to conduct a Pre-install Solution Assurance Review?()A As soon as possible after a firm orderB Immediately after the Pre-sale reviewC As near as possible to the scheduled ship dateD After all the items in the site preparation are complete
问题:单选题A sportswear company recently had a visit from a sales rep of a well-known computer vendor. The sales rep gave a presentation on the advantages of VPAR and NPAR. Which of the following companies made this presentation?()A HPB IBMC SUND Dell
问题:单选题AIX 5L and SUN Solaris have differing approaches at handling processor failures. Which statement best describes how AIX handles processor failures?()A If AIX discovers a processor with too many recoverable errors during runtime, it will dynamically turn off that processor, while the rest of the system keeps running.B If AIX detects a failing processor it will automatically move all resources to another processor. The failed processor can be hot-swapped and the new replacement becomes the active processor.C If AIX determines a processor is failing, it will perform diagnostics to determine which processor function can be disabled and dynamically reallocate all CPU and memory resources thus isolating the failure condition and preventing a reboot.D If AIX senses a processor level error condition, internal diagnostics are activated to determine the severity of the problem. After the failure threshold is met, a message is broadcast to the service processor informing the operator to perform a system reboot.
问题:单选题A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A Linux will be restricted to the p650 system, as it is not supported on the p630.B The customer can run Linux on all the existing systems with or without the presence of AIX.C Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.