The minimum amount of lifesaving equipment required aboard an 85-foot uninspected towing v

题目

The minimum amount of lifesaving equipment required aboard an 85-foot uninspected towing vessel consists of ______.

A.One approved flotation cushion for each person on board

B.One approved life preserver for each person on board and one life ring

C.One approved inflatable vest for each person on board

D.Lifeboat capacity equal to 1 1/2 times the number of persons on board

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the ______.

A.Oil Transfer Procedures Manual

B.Crude Oil Washing Operations and Equipment Manual

C.Code of Federal Regulations

D.Crude Oil Washing addendum to the Certificate of Inspection


正确答案:B

第2题:

Which document lists all the lifesaving equipment required for a vessel?

A.Certificate of Inspection

B.American Bureau of Shipping Classification Certificate

C.International Convention for the Safety of Life at Sea Certificate

D.Certificate of Registry


正确答案:A

第3题:

The Sailing Directions contain information on ______.

A.required navigation lights

B.lifesaving equipment standards

C.casualty reporting procedures

D.currents in various locations


正确答案:D

第4题:

单选题
During an annual FCC inspection().
A

All required documents and publications may have to be produced

B

Licensed GMDSS radio operators may be required to demonstrate equipment competencies

C

All required equipment must be fully operational

D

All of the above


正确答案: C
解析: 暂无解析

第5题:

Lifesaving equipment shall be stowed so that it will be ______..

A.locked up

B.readily accessible for use

C.inaccessible to passengers

D.on the topmost deck of the vessel at all time


正确答案:B
救生设备应放在容易拿到使用的地方。

第6题:

The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ______.

A.terminal operator

B.owner of the barge

C.tankerman or person in charge of loading

D.charterer through the Master of the towing vessel


正确答案:C

第7题:

Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT ______.

A.Start the mechanical ventilation system for the engine room

B.Operate the fuel shut-off for the engine room

C.Operate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pump

D.All of the above


正确答案:A

第8题:

What is NOT required on an uninspected towing vessel?

A.Certificate of Documentation

B.Certificate of Inspection

C.Operators Merchant Marine license

D.FCC Station License


正确答案:B

第9题:

What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()? 

  • A、128 MB
  • B、256 MB
  • C、512 MB
  • D、1024 MB

正确答案:B

第10题:

单选题
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().
A

terminal operator

B

owner of the barge

C

tankerman or person in charge of loading

D

charterer through the Master of the towing vessel


正确答案: D
解析: 暂无解析

更多相关问题