During the planning stage of cargo operations,stress and displacement calculations should

题目

During the planning stage of cargo operations,stress and displacement calculations should be carried out at incremental steps commensurate with the number of _____ and loading sequence of the proposed operation.

A.coefficient of loading

B.stowage factors

C.orders

D.pours

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which statement(s) is/are TRUE concerning crane cargo operations?

A.Do not exceed rated load capacity of crane and container spreader or slings

B.During any cargo handling operation,the safety of personnel is paramount

C.Cargo handlers must be outfitted with adequate protection from personal injury

D.All the above


正确答案:D

第2题:

During cargo operations,your vessel develops a list due to the center of gravity rising above the transverse metacenter.To correct the list,you should ______.

A.Shift weight to the high side

B.Shift weight to the centerline

C.Add weight in the lower holds or double bottoms

D.Remove weight from the lower holds or double bottoms


正确答案:C

第3题:

Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.

A.Preventers

B.Side ropes

C.Stays

D.Guide lines


正确答案:A
钢丝绳链接吊杆,防止它们的货物装卸作业期间摆动称为老盖。

第4题:

At which stage of the service lifecycle should the processes necessary to operate a new service be defined? ( ) 。

A.Service design: Design the processes
B.Service strategy: Develop the offerings
C.Service transition: Plan and prepare for deployment
D.Service operation: IT operations management

答案:A
解析:

第5题:

During which condition should be operator of a pedestal crane shutdown operations?

A.Bunkering

B.High winds

C.Potable water spill on deck

D.More than 3°list


正确答案:B
在那种情况下,应该关闭克令吊作业?大风。

第6题:

Which safety precaution(s)should be observed during crane operations ________.

A.Checking for proper lifting from beneath the load during cargo operations

B.Using the proper slings or other lifting devices during cargo operations

C.Relaying communications to port agents on the pier during cargo hoists

D.All of the above


正确答案:B

第7题:

A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.

A.Cargo has been loaded or discharged

B.Cargo hose is connected

C.Cargo pumps are started

D.Vessel is ready to handle cargo


正确答案:D

第8题:

When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.

A.remove an existing list that would slow down cargo operations

B.initiate loading in conjunction with unloading at the hatch

C.improve stability during cargo operations

D.allow longshoremen easy access to the hatch


正确答案:B

第9题:

To achieve fluency, when should correction be conducted?

A.After class.
B.The moment error occurs.
C.At the summary stage of the activity.
D.During the course of the communication.

答案:C
解析:
考查课堂纠错。为保证讲话的流利性,应在总结时候纠正讲话时犯的错误,而不是立即纠正。

第10题:

单选题
The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().
A

allow greater than normal loads to be handled by the gear

B

act as an inboard guy in the event the inboard guy parts during cargo handling

C

assist the outboard guy in supporting stresses during cargo handling

D

prevent the inboard guy from parting due to stresses during cargo handling


正确答案: A
解析: 暂无解析