147 Parametric estimates are based on variables such as:
A. Detailed planning and cost restraints.
B. Physical characteristics and historical data.
C. The WBS and similar projects.
D. Project objectives and manpower allocations.
E. Precise measurements and multiple inputs
第1题:
5 Which of the following constitute Juran's "quality trilogy":
A. planning, inspection, control.
B. planning, improvement, control.
C. planning, organization, control.
D. product, price, customer.
E. design, build, deliver.
第2题:
(A) evaluates
(B) value
(C) intimate
(D) estimates
正确答案:D
解答参考:D.词义辨析题。estimate,动词,意思为估计;intimate,形容词,亲密的;evaluate是评价的意思,故根据题意选择D。【译文】她估计房间里有二十多人,这些人大多是背对她坐的。
第3题:
Which of the following constitute Juran's "quality trilogy":
A . planning, inspection, control.
B . planning, improvement, control.
C . planning, organization, control.
D . product, price, customer.
E . design, build, deliver.
第4题:
第5题:
I’m sure all will go well as().
A. being planned
B. planned
C. having planned
D. planning
第6题:
57 Which of the following are types of status reports?
A. document, variance, trend and exception
B. cost, trend, schedule and acquisition
C. cost, schedule, technical performance
D. analysis, cost, performance and schedule
E. All of the above.
第7题:
[A] spending
[B] planning
[C] financing
[D] saving
第8题:
123 Which of the following constitute Juran's "quality trilogy":
A. planning, inspection, control.
B. planning, improvement, control.
C. planning, organization, control.
D. product, price, customer.
E. design, build, deliver.
第9题:
第10题:
在实际的工作计划制定过程中,主要采用三种方法:“基于项目(Project-based)”,“基于流程(Process-based)”和基于时间(Time-based)。