A project life cycle is a collection of generally sequential project whose name and number are determined by the control needs of the organization or organizations involved in the project. The life c

题目
A project life cycle is a collection of generally sequential project whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic () for managing the project, regardless of the specific work involved.

A. plan
B. fraction
C. main
D.framework
参考答案和解析
答案:D
解析:
一个项目的生命周期由若干个顺序相连的阶段组成,阶段的名字和个数由组织的控制需要决定。项目涉及到的其他组织,其控制需要也可决定项目阶段的名字和个数。无论涉及到的具体的工作有哪些,项目的生命周期都为管理项目提供了基本的()
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

67 The project stakeholders should be actively involved with the _____ phase(s) of the life cycle. A. Conceptual

B. Development.

C. Execution

D. Finish

E. All of the above


正确答案:E

第2题:

185 Life Cycle Costing:

A. is the concept of including all costs within the total life of a project.

B. is an activity devoted to optimizing cost/performance

C. is an activity of appraising the cost and technical performance of a completed project.

D. is a process of predicting the life of a project.

E. None of the above


正确答案:A

第3题:

The project life-cycle can be described as:

A.project concept, project planning, project execution, and project close-out.

B.project planning, work authorization, and project reporting.

C.project planning, project control, project definition, WBS development, and project termination.

D.project concept, project execution, and project reporting.

E.All of the above.


正确答案:A
A

第4题:

● A project life cycle is a collection of generally sequential project (73)whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74)for managing the project, regardless of the specific work involved.

(73)

A. phases

B. processes

C. segments

D. pieces

(74)

A. plan

B. fraction

C. main

D. framework


正确答案:A,D

第5题:

● The sequential steps that define the process for successfully completing a project is:

A Implementation Plan

B a life cycle

C Development Plan

D a critical path

E Management Plan


正确答案:B

第6题:

167 The project life-cycle can be described as:

A. project concept, project planning, project execution, and project close-out.

B. project planning, work authorization, and project reporting.

C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

E. All of the above


正确答案:A

第7题:

67 Life Cycle Costing:

A. is the concept of including all costs within the total life of a project.

B. is an activity devoted to optimizing cost/performance

C. is an activity of appraising the cost and technical performance of a completed project.

D. is a process of predicting the life of a project.

E. None of the above.


正确答案:A

第8题:

The project stakeholders should be actively involved with the _____ phase(s) of the life cycle.

A.Conceptual

B.Development.

C.Execution

D.Finish

E.All of the above.


正确答案:E
E

第9题:

● The project stakeholders should be actively involved with the _____ phase(s) of the life cycle.

A Conceptual

B Development.

C Execution

D Finish

E All of the above.


正确答案:E

第10题:

● The project life-cycle can be described as(72).

(72)

A.project concept, project planning, project execution, and project close-out

B.project planning, work authorization, and project reporting

C.project planning, project control, project definition, WBS development, and project termination

D.project concept, project execution, and project reporting


正确答案:A

试题(72)分析
  关于项目周期划分正确的是  (72)  。
  A.启动、计划、执行、收尾
  B.计划、授权、报告
  C.计划、控制、方案设计、WBS的发展、终止
  D.启动、执行、报告
参考答案
  (72)A

更多相关问题