Configuration Management controls what? 配置管理控制什么?()
第1题:
A comprehensive definition of scope management would be:
A.Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.
B.Approval of the scope baseline.
C.Approval of the detailed project charter.
D.Configuration control.
E.Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.
第2题:
145 The initial document that formally recognizes the existence of a project is the _____ .
A. Scope baseline
B. Management plan
C. Project charter
D. Configuration control report
E. None of the above
第3题:
The initial document that formally recognizes the existence of a project is the _____ .
A.Scope baseline
B.Management plan
C.Project charter
D.Configuration control report
E.None of the abov
第4题:
● A comprehensive definition of scope management would be:
A Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.
B Approval of the scope baseline.
C Approval of the detailed project charter.
D Configuration control.
E Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.
第5题:
● The initial document that formally recognizes the existence of a project is the _____ .
A Scope baseline
B Management plan
C Project charter
D Configuration control report
E None of the above
第6题:
33 The purpose of configuration management is to:
A. insure drawings are updated
B. control change throughout the project
C. control change during the production only
D. generate engineering change proposals
E. inform. the project manager of changes
第7题:
● Project life cycles are very useful for _____ and _____ .
A Configuration management, termination
B Objective setting, information gathering
C Standardization, control
D Configuration management, weekly status updates
E Approval, termination
第8题:
The purpose of configuration management is to:
A.insure drawings are updated
B.control change throughout the project
C.control change during the production only
D.generate engineering change proposals
E.inform. the project manager of changes
第9题:
● The purpose of configuration management is to:
A insure drawings are updated
B control change throughout the project
C control change during the production only
D generate engineering change proposals
E inform. the project manager of changes
第10题:
● Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. As change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identification of significant states within the revision history of a configuration item is the central purpose of (75) identification.
(75)
A. baseline
B. value
C.cost
D. control