Configuration Management control

题目

Configuration Management controls what? 配置管理控制什么?()

  • A、Auditing and controlling any changes to the Trusted Computing Base. 审计和控制对可信计算基的任何更改
  • B、Auditing of changes to the Trusted Computing Base. 审计可信计算基的变更
  • C、Control of changes to the Trusted Computing Base. 控制可信计算的变更
  • D、Changes in the configuration access to the Trusted Computing Base. 对可信计算基配置访问的变更
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A comprehensive definition of scope management would be:

A.Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.

B.Approval of the scope baseline.

C.Approval of the detailed project charter.

D.Configuration control.

E.Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.


正确答案:A
A

第2题:

145 The initial document that formally recognizes the existence of a project is the _____ .

A. Scope baseline

B. Management plan

C. Project charter

D. Configuration control report

E. None of the above


正确答案:C

第3题:

The initial document that formally recognizes the existence of a project is the _____ .

A.Scope baseline

B.Management plan

C.Project charter

D.Configuration control report

E.None of the abov


正确答案:D

 

第4题:

● A comprehensive definition of scope management would be:

A Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.

B Approval of the scope baseline.

C Approval of the detailed project charter.

D Configuration control.

E Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.


正确答案:A

第5题:

● The initial document that formally recognizes the existence of a project is the _____ .

A Scope baseline

B Management plan

C Project charter

D Configuration control report

E None of the above


正确答案:C

第6题:

33 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes


正确答案:B

第7题:

● Project life cycles are very useful for _____ and _____ .

A Configuration management, termination

B Objective setting, information gathering

C Standardization, control

D Configuration management, weekly status updates

E Approval, termination


正确答案:C

第8题:

The purpose of configuration management is to:

A.insure drawings are updated

B.control change throughout the project

C.control change during the production only

D.generate engineering change proposals

E.inform. the project manager of changes


正确答案:B
B

第9题:

● The purpose of configuration management is to:

A insure drawings are updated

B control change throughout the project

C control change during the production only

D generate engineering change proposals

E inform. the project manager of changes


正确答案:B

第10题:

● Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. As change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identification of significant states within the revision history of a configuration item is the central purpose of (75) identification.

(75)

A. baseline

B. value

C.cost

D. control


正确答案:A