Following an unscheduled power

题目

Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()

  • A、Physically press the appropriate button on the system.
  • B、Physically disconnect and reconnect the power cable on the system.
  • C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
  • D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
参考答案和解析
正确答案:A
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()

A. There is a fire hazard potential if a power outage occurs.

B. The last system plugged into the UPS will not be provided any power.

C. The UPS will draw more power from the circuit to compensate.

D. The runtime of the UPS will be insufficient if a power outage occurs.


参考答案:D

第2题:

A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()

  • A、Backup power generator
  • B、Uninterruptable power supply
  • C、Power line conditioners
  • D、Surge protectors

正确答案:B

第3题:

A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()

A. Backup power generator

B. Uninterruptable power supply

C. Power line conditioners

D. Surge protectors


参考答案:B

第4题:

Which of the following is the BEST case scenario for power fault tolerance within a server?()

  • A、 Redundant power supplies with one power supply connected and one power supply as a hot spare.
  • B、 Redundant power supplies with each connected to a separate power circuit.
  • C、 Redundant power supplies connected via a Y-cable.
  • D、 Redundant power supplies with each connected to the same power circuit.

正确答案:B

第5题:

Which of the following is the MOST likely to cause a server power supply fan to fail but allows the power supply to still be functional?()

  • A、Dust
  • B、Power Surge
  • C、Excessive humidity
  • D、High temperatures

正确答案:A

第6题:

A vessel proceeding to London,England,from New York makes an unscheduled call at the port of Hamilton,Bermuda.What term is used to denote the voluntary departure from the usual course?

A.Alteration

B.Deviation

C.Liberty

D.Unscheduled stop


正确答案:B

第7题:

Which of the following tools is BEST used to measure voltage and amperage from a power source?()

  • A、Loopback Plug
  • B、Multimeter
  • C、Power Supply Tester
  • D、Extension Magnet

正确答案:B

第8题:

A technician is testing a power supply for correct output voltages at the HDD power connector.Which of the following voltages should the technician expect for a correctly working power supply?()

A.6V

B.9V

C.12V

D.24V


参考答案:C

第9题:

An administrator is troubleshooting a power supply that is believed to have failed. Which of the following tools will BEST help test the power supply?()

  • A、ESD Equipment
  • B、Multimeter
  • C、POST Card
  • D、Toner Probe

正确答案:B

第10题:

The technician has replaced a power supply with an identical power supply, and now the high end graphics card is not working. Which of the following should the technician check?()

  • A、The memory
  • B、The CMOS battery
  • C、The PCIe power jack
  • D、The processor for chip creep

正确答案:C

更多相关问题