Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()
第1题:
A. There is a fire hazard potential if a power outage occurs.
B. The last system plugged into the UPS will not be provided any power.
C. The UPS will draw more power from the circuit to compensate.
D. The runtime of the UPS will be insufficient if a power outage occurs.
第2题:
A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()
第3题:
A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()
A. Backup power generator
B. Uninterruptable power supply
C. Power line conditioners
D. Surge protectors
第4题:
Which of the following is the BEST case scenario for power fault tolerance within a server?()
第5题:
Which of the following is the MOST likely to cause a server power supply fan to fail but allows the power supply to still be functional?()
第6题:
A vessel proceeding to London,England,from New York makes an unscheduled call at the port of Hamilton,Bermuda.What term is used to denote the voluntary departure from the usual course?
A.Alteration
B.Deviation
C.Liberty
D.Unscheduled stop
第7题:
Which of the following tools is BEST used to measure voltage and amperage from a power source?()
第8题:
A.6V
B.9V
C.12V
D.24V
第9题:
An administrator is troubleshooting a power supply that is believed to have failed. Which of the following tools will BEST help test the power supply?()
第10题:
The technician has replaced a power supply with an identical power supply, and now the high end graphics card is not working. Which of the following should the technician check?()