The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for t

题目

The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()

  • A、IBM DS8700 
  • B、IBM N6040 
  • C、IBM Storwize V7000 
  • D、IBM XIV Storage System
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance.Which of the following actions should be recommended as a first step?()

A. install the Performance Accelerator feature

B. review the DS Storage Manager Major Event Log (MEL)

C. add an expansion frame with additionalFibre Channel ports

D. review the latest TPC for Disk study to identify the source of the performance issue


参考答案:D

第2题:

A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()

  • A、One fibre channel switch
  • B、Two fibre channel switches
  • C、Two Ethernet cards
  • D、Nothing

正确答案:B

第3题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

A. operator training

B. cache size of the two clusters

C. fibre bandwidth capability between the sites

D. number of stacked tape drives attached to each cluster


参考答案:C

第4题:

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()

  • A、RDAC
  • B、MPIO
  • C、SSPC
  • D、SDDPCM

正确答案:B

第5题:

A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()

  • A、Reserve Capacity on Demand
  • B、Utility Capacity on Demand
  • C、Capacity Upgrade on Demand
  • D、Uncapped Capacity on Demand

正确答案:C

第6题:

A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation.What multipathing driver is required to build a redundant solution?()

A.RDAC

B.MPIO

C.SSPC

D.SDDPCM


参考答案:B

第7题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

  • A、8 drive sets of 300 GB drives
  • B、4 drive sets of 300 GB drives
  • C、14 drive sets of 146 GB drives
  • D、18 drive sets of 146 GB drives

正确答案:D

第8题:

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()

A. 8 drive sets of 300 GB drives

B. 4 drive sets of 300 GB drives

C. 14 drive sets of 146 GB drives

D. 18 drive sets of 146 GB drives


参考答案:D

第9题:

The Windows group has two SQL servers that need to add 1 TB of additional disk. Each of theWindows servers already has a SAS RAID adapter. It is expected that over time the storagerequirements will grow beyond the capability of internal disks. There are no additional adapterslots available on the servers. What is the most cost effective IBM solution for this customer tomeet the immediate needs today and the future growth of tomorrow?()

  • A、DS3300 
  • B、DS3400 
  • C、EXP5000 expansion enclosure 
  • D、EXP3000 expansion enclosure

正确答案:D

第10题:

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

  • A、operator training
  • B、cache size of the two clusters
  • C、fibre bandwidth capability between the sites
  • D、number of stacked tape drives attached to each cluster

正确答案:C