A System p admistrator must document the date of the latest 

题目
单选题
A System p admistrator must document the date of the latest update of the development systems. Which of the following commands will provide this information ()
A

lppchk -l

B

lslpp -h

C

installp -h

D

lppchk -v

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

Two users share the same Windows 7 computer. The first user creates a document intended to be used by both users, and then logs off. The second user logs on and types the name of the document in the Start menu, but the document is not found. Which of the following is the problem?()

A. The document is set to hidden.

B. The document is locked.

C. The document was saved as a system document.

D. The document is owned by the first user.


参考答案:D

第2题:

describes how to interact with the information system to accomplish specific tasks.

A.System specification

B.Program specification

C.User guide

D.System document


正确答案:C

第3题:

听力原文:M: Would you tell me about the main contents of the document?

W: Name, quality, unit price and amount of goods, ports of loading and destination, price and payment terms, shipping documents, latest shipment date and validity of the L/C.

Q: What may be the name of the document?

(19)

A.Collection Order.

B.Bill of Lading.

C.Letter of Credit.

D.Certificate of Origin.


正确答案:C
解析:根据女士的回答,单据上面含有商品名称、数量、金额、单价,装货和运输目的地港口,总价金额和支付条款,运输单,最迟运输日期和单证合法性等各方面信息。由此可以推断出此单证就是信用证。

第4题:

Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()

  • A、 elapsed time since the target start date or completion date of previous work generated by PM  
  • B、 difference between completion date of previous work and system date is equal to Lead Time  
  • C、 elapsed time since the target start date or completion date of the latest work orders for the asset
  • D、 metered equipment usage since the target start date or completion date of previous work generated by PM
  • E、 metered equipment usage since the target start date or completion date of the latest work order for the asset

正确答案:A,D

第5题:

The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable( )of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each(请作答此空)that it must meet.The starting point is usually a set of high level requirements from the( )that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines( )showing how the system will be operated publishes the system and operations concept document and conducts a system concept review(SCR).Following the SCR,the team derives( )requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

A.criterion
B.standard
C.model
D.system

答案:A
解析:

第6题:

A(n) ______ document is an interlinked system of documents in which a user may iump from one document to another in a nonlinear,associative way.

A.Hipertext

B.Web

C.Html

D.XML


正确答案:A
解析:超文本文档是一种链接的文档系统,用户能够以非线性关联的方式从一个文档跳转到另一个文档。

第7题:

You are signing on a deck officer,who will be designated as one of the GMDSS operators,before sailing foreign.Which statement is TRUE ________.

A.He/she must have an STCW certificate endorsed as“Valid for Service on Vessels Operating in the GMDSS System”

B.He/she must present either an FCC-issued license or a Coast Guard-issued license

C.You must consult the“List of Qualifications”on the reverse of his/her FCC-issued license

D.His/her Merchant Mariners Document must have an added endorsement as “Radio Electronics Officer”


正确答案:A

第8题:

When saving a document you must decide on a name for the document and the(73)where it will be saved to.

A.location

B.size

C.title

D.attribute


正确答案:A
解析:保存文档时应指定文件名及其保存的位置。

第9题:

The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.

A.system charter
B.system scope definition
C.system blueprint
D.system requirements document

答案:B
解析:
翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(73) A.系统章程B.系统范围定义C.系统蓝图 D.系统需求文件
参考答案:(73)B

第10题:

After upgrading a server motherboard to the latest firmware revision, configuring LAN access in the SSU (System Setup Utility) fails. Which action should be taken FIRST to correct this problem?()

  • A、 replace the NIC
  • B、 install the latest SSU (System Setup Utility) version
  • C、 upgrade the firmware on the NIC
  • D、 assign the NIC a static IRQ in the SSU (System Setup Utility)

正确答案:C

更多相关问题