a fairlead block
a swivel pin for the topping lift block
a triangular steel plate with a hole at each corner
the lower block of a multiple part topping lift
第1题:
With a given load on the cargo hook,tension in a single span topping lift ______.
A.increases as the boom's angle to the horizontal increases
B.is at a maximum when the boom is at a 45° angle to the horizontal
C.increases as the boom's angle to the horizontal decreases
D.decreases as the boom's angle to the horizontal decreases
第2题:
topping lift()
第3题:
Stress on the topping lift of a swinging boom can be reduced by ______.
A.rigging a back stay
B.raising the boom
C.increasing the mechanical advantage of the cargo purchase
D.taking all slack out of the preventer
第4题:
板块构造(plate tectonics)
第5题:
集装箱船舶吊装卸作业方式(Lift on/Lift off system)有何优点?
第6题:
The type of joint formed when an edge of one plate is laid over the edge of the plate to which it is riveted is a ______.
A.Grip joint
B.Strap joint
C.Thread joint
D.Lap joint
第7题:
The jumbo boom can ().
第8题:
A band or collar on the top end of a boom to which the topping lift,midships guy,and outboard guys are secured,is called the ______.
A.collar band
B.guy band
C.pad eye collar
D.spider band
第9题:
英译中:Number plate
第10题:
滑车()