A charterer is unable to complete the loading of a vessel du

题目
单选题
A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the().
A

vessel operator can collect demurrage

B

ship is authorized extra time to discharge the cargo

C

charterer must pay dispatch money

D

effective period of the charter is extended

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the ______.

A.vessel operator can collect demurrage

B.ship is authorized extra time to discharge the cargo

C.charterer must pay dispatch money

D.effective period of the charter is extended


正确答案:A

第2题:

Delivery of a vessel to a charterer is called ______.

A.chartering

B.dispatching

C.fixing

D.tendering


正确答案:D

第3题:

On a voyage charter party when the vessel is in port the charter will specify a definite period of time for loading or discharging of cargo by the Charterer.This time is called ________ .

A.Demurrage

B.Dispatch

C.Days of readiness

D.Laydays


正确答案:D

第4题:

While off-loading from an offshore supply vessel with the crane,the wind increases in strength and changes direction significantly,you should ______.

A.Expedite off-loading

B.Stop off-loading,but keep the offshore supply vessel in the present location

C.Continue off-loading with no changes

D.Move the offshore supply vessel to the downwind side


正确答案:D

第5题:

The charterer has completed loading the vessel in 3 days instead of the 5 days agreed to in the charter party.As a result of this,the ______.

A.Shipowner may charge for two laydays

B.Charterer may receive dispatch money

C.Stevedore may collect demurrage

D.Consignee may be required to pay a ceaser fee


正确答案:B

第6题:

The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ______.

A.terminal operator

B.owner of the barge

C.tankerman or person in charge of loading

D.charterer through the Master of the towing vessel


正确答案:C

第7题:

The Captain enters into the Salvage Contract as the representative of ______.

A.the owner of vessel

B.the owner of vessel and her cargo

C.the owner of vessel,her cargo and freight

D.the owner of vessel,her cargo,freight and Charterer


正确答案:C

第8题:

On a voyage charter,when a vessel is ready to load cargo,the Master should render to the charterer a ______.

A.Notice of Readiness

B.Master Certificate of Service

C.Shipmasters Declaration

D.Vessel Utilization and Performance Report


正确答案:A

第9题:

When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.

A.Available dunnage,and chocking

B.Crushability,and inherent vice

C.Sweat,and weight

D.Weight,and refrigeration


正确答案:D

第10题:

翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port


正确答案:在装卸港所需岸上理货人员,由船方雇佣并负担费用