Each part of the fire-main system located on an exposed deck

题目
单选题
Each part of the fire-main system located on an exposed deck must be().
A

protected against freezing

B

locked to prevent theft

C

numbered sequentially

D

pressurized at all times

参考答案和解析
正确答案: D
解析: 暂无解析
如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

According to the regulations,normally,manholes in LFG tanks are located ______.

A.In the ends of each tank

B.In the expansion trunk of each tank

C.Above the weather deck

D.There are no requirements in the regulation


正确答案:C

第2题:

A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.

A.Fire hose might be damaged by cargo operations

B.Vessel is in port

C.Fire-main system is not charged

D.Fire pumps are used for purposes other than supplying water to the fire main


正确答案:A

第3题:

The female reproductive system is located in the ()

A、chest

B、pelvis

C、stomach

D、abdomen


参考答案:B

第4题:

The company has two thousand servers located around the globe. Which of the following is the BEST method of patch management and deployment?()

  • A、Set all servers to automatically download patches from the manufacturer’s website.
  • B、Install an internal patch management system and deploy from the system.
  • C、Install the patches on each server from a deployment disk.
  • D、RDP into each server, manually download and install the patches.

正确答案:B

第5题:

What is the primary use of the IBM Configuration & Options Guide (COG)? ()

  • A、IBM System x ServicePac part number look up
  • B、Operating system and part number look up
  • C、General server information and part number look up
  • D、Software compatibility charts

正确答案:C

第6题:

The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.

A.The name of each person designated as the person in charge of transfer

B.A line diagram of the vessel's oil transfer piping

C.Special procedures for topping off tanks

D.A description of the deck discharge containment system


正确答案:A

第7题:

Before starting to hoist provisions, which should be checked?______.

A.Hoist rope is not kinked

B.Multiple part lines are not twisted around each other

C.The hook is centrally located over the load

D.All of the above


正确答案:D
在起吊伙食前,应该检查什么?以上都对。

第8题:

What would NOT require that a detailed report of the release of hazardous cargo be made to the Department of Transportation?

A.The valve on an empty portable tank that contained acetone is accidently opened and some of the residue escapes to the open sea

B.A carboy of nitric acid is broken on deck while loading and is flushed overboard with no injury or damage

C.Part of your deck cargo of five gallon cans of paint is damaged and leaking so you jettison them to eliminate the fire hazard

D.Heavy weather causes damage to packages of a hazardous liquid that is subsequently pumped out at sea through the bilge pumping system.


正确答案:C

第9题:

艏楼甲板位于船艏部。()

  • A、Forecastle deck is located at the ship’s stern.
  • B、Poop deck is located at the ship’s bow.
  • C、Forecastle deck at located in the ship’s bow.
  • D、Poop deck is located at the ship’s stern.

正确答案:C

第10题:

A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change. What is the best way to handle this using LPAR?()

  • A、Create a system profile. Reconfigure the managed system by activating and deactivating the system profiles. 
  • B、Create one partition profile for each client. Reconfigure the managed system by activating the partition profiles for that client. 
  • C、Dynamically move processors and memory as needed into each logical partition. Reconfigure the managed system by activating and deactivating partition profiles. 
  • D、Dynamically move processors and memory into each logical partition on the server if additional resources are needed. Reconfigure the managed system by activating and deactivating the system profiles.

正确答案:B

更多相关问题