The reason for the obligation to load a full cargo()that oth

题目
单选题
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
A

is

B

makes

C

has

D

takes

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The claim for dead freight being a claim for damages for breach of contract,the Shipowner is under a duty,where the Charterer fails to load a full and complete cargo,______ the damage by obtaining other cargo,provided he acts reasonably in so doing.

A.to minimize

B.minimizing

C.minimized

D.have minimized


正确答案:A

第2题:

Cargo securing for Ro-Ro is based on the concept of _______.

A.Solid packing

B.Rapid loading and discharge

C.Vessel loaded full and down to her marks

D.Palletized cargo


正确答案:B

第3题:

What equipment can be used to load cargo?


正确答案:It depends on the cargo to be loaded. The loading equipment includes deck cranes, derricks, shore cranes, convey belt, loading machines, crabs, and so on. .

第4题:

英译中:Full container load(FCL)


正确答案: 整箱

第5题:

大副告诉装卸工人不要用钩子装袋装货。()

  • A、The chief officer told the stevedores not to use hooks to load the deck cargo.
  • B、The bosun told the stevedores not to use hooks to load the bagged cargo.
  • C、The chief officer told the stevedores not to use hooks to load the bagged cargo.
  • D、The bosun told the stevedores not to use hooks to load the deck cargo.

正确答案:C

第6题:

You are on a multiple-product tanker and scheduled to load a cargo classed as an aromatic amine.This cargo is incompatible with cargoes classed as ______.

A.organic anhydrides

B.ketones

C.phenols

D.esters


正确答案:A

第7题:

If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.

A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the load

B.An electromagnetic brake will hold the load where it is suspended

C.The load will fall rapidly to the deck unless the foot brake is engaged

D.The load will slowly lower to the deck under control of the drag of the winch motor


正确答案:B

第8题:

Which of the following is the FINAL step in the backup process?()

A. Load differential tape

B. Verify backup

C. Load new tapes

D. Perform a full backup


参考答案:B

第9题:

整箱货(Full-Container-Load,简称FCL)


正确答案:指发货人一次托运的货物数量较多,足以装满一个或多个集装箱的货载。

第10题:

Which of the following is the FINAL step in the backup process?()

  • A、 Load differential tape
  • B、 Verify backup
  • C、 Load new tapes
  • D、 Perform a full backup

正确答案:B

更多相关问题