consealed
detained
contained
kept
第1题:
A Master should file a marine note of protest if ______.
A.cargo was received at ship side which was damaged in land transit
B.longshore labor went on strike in the port causing undue vessel delay
C.portions of his vessel's cargo were illegally impounded in a foreign port
D.the vessel encountered heavy weather which might have caused cargo damage
第2题:
To determine which grades of cargo a tank vessel is permitted to carry you should ______.
A.refer to the vessel's Certificate of Inspection
B.examine the cargo tanks and fittings
C.ask the terminal supervisor or his representative
D.check the loading order
第3题:
______ of the following statements is INCORRECT regarding a fire and boat drill on board your cargo vessel.
A.At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replaced
B.The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months.
C.Lifeboat equipment shall be examined at least once each month to insure that it is complete
D.An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill
第4题:
Protest acts of violence or misconduct by the vessel's crew
State that damage to cargo or vessel was caused by improper loading or pilferage by others rather than ship's personnel
State that the damage to ship,cargo or both was due to the perils of the sea
State that the perishable cargo was damaged because of negligence by port authorities or other officials
第5题:
Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all ______.
A.Fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stations
B.Interior fire stations
C.Engine room fire stations
D.All of the above
第6题:
When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?
A.Call the owner,operator,or terminal supervisor
B.Unplug the deck scuppers
C.Order the dock man to shut down
D.Run out the vessel's or terminal's fire hose
第7题:
The owner or Master of a towing vessel shall ensure that all tests and inspections of gear take place and are logged ______.
A.when a new Master assumes command
B.daily,at 0800 local zone time
C.weekly,before 2400 Saturday
D.immediately after assuming the watch
第8题:
Cargo transfer operations on a tank vessel need NOT be stopped when ______.
A.a tug comes alongside while the tanker is loading grade D and E cargoes
B.a large,fresh oil spill is discovered immediately adjacent to the side of the tanker
C.there is an electrical storm in the vicinity
D.there is a fire on the dock or on a nearby vessel
第9题:
A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.
A.Fire hose might be damaged by cargo operations
B.Vessel is in port
C.Fire-main system is not charged
D.Fire pumps are used for purposes other than supplying water to the fire main
第10题:
Shutting off electricity to damaged cables
Pumping fire-fighting water overboard
Maneuvering the vessel so the fire is on the lee side
Removing burned debris from the cargo hold