On a cargo vessel, fire and boat drills must be held within

题目
单选题
On a cargo vessel, fire and boat drills must be held within 24 hours of leaving port if the percentage of the crew replaced is more than ().
A

5%

B

10%

C

25%

D

40%

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.

A.within 4 days after the seaman's discharge

B.prior to the vessel's departure on the next voyage

C.prior to loading any out-bound cargo

D.prior to any change of Master


正确答案:A

第2题:

You are on a cargo vessel carrying toluol in bulk in portable tanks. Which is a requirement for pumping the toluol?

A.Hose connections to the tank must be made with a minimum of three bolts

B.There must be water pressure on the fire main

C.You must shut down if another vessel comes alongside

D.If transferring at anchor,you must display a red flag by day and a red light at night


正确答案:B

第3题:

At the earliest indication of fire aboard your vessel, you must FIRST ______.

A.locate the fire

B.determine which type of fire is burning

C.sound the alarm

D.fight the fire


正确答案:C

第4题:

单选题
If you are fighting a fire below the main deck of your vessel,which action is most important concerning the stability of the vessel?().
A

Shutting off electricity to damaged cables

B

Pumping fire-fighting water overboard

C

Maneuvering the vessel so the fire is on the lee side

D

Removing burned debris from the cargo hold


正确答案: B
解析: 暂无解析

第5题:

Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all ______.

A.Fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stations

B.Interior fire stations

C.Engine room fire stations

D.All of the above


正确答案:D

第6题:

Prior to getting underway,the Master or person in charge of a vessel must ______.

A.conduct a fire drill

B.conduct a boat drill

C.log the fore and aft draft marks

D.test the emergency generator


正确答案:C

第7题:

Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency.Drills include all of the following,EXCEPT ______.

A.testing all alarm and detection systems

B.breaking out and using the vessel's emergency equipment

C.participation by selected crew members

D.one person putting on protective clothing,if the vessel is so equipped


正确答案:C

第8题:

______ of the following statements is INCORRECT regarding a fire and boat drill on board your cargo vessel.

A.At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replaced

B.The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months.

C.Lifeboat equipment shall be examined at least once each month to insure that it is complete

D.An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill


正确答案:B

第9题:

A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.

A.Fire hose might be damaged by cargo operations

B.Vessel is in port

C.Fire-main system is not charged

D.Fire pumps are used for purposes other than supplying water to the fire main


正确答案:A

第10题:

单选题
Once a vessel has loaded packaged hazardous cargo,the cargo spaces shall be inspected. The spaces shall also be inspected at least once in every 24 hours. The only exception to daily inspection is when().
A

a vessel is equipped with an automatic smoke or fire detecting system

B

the cargo hatches are of steel construction

C

the cargo is of a nonflammable type

D

there is sufficient fire protection located on the main deck adjacent to the cargo hatch


正确答案: A
解析: 暂无解析

更多相关问题