On a ship crane,the load chart relates the allowable load to

题目
单选题
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
A

boom angle

B

boom strength

C

load radius

D

cable strength

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.

A.Maximum counter weight required

B.Minimum horsepower required

C.Hoist rope strength

D.Allowable load


正确答案:D

第2题:

What does “evel-luffing” accomplish during crane operations ________.

A.It prevents the load from swinging when the boom level is adjusted

B.Less power is needed when topping the boom with a load on the hook

C.It maintains the height of the load above the deck

D.All of the above


正确答案:D

第3题:

The stevedores are going to load your ship in ________ days

A.few

B.a few

C.little

D.a little


正确答案:B

第4题:

单选题
When ship is fouled, increasing the fuel injection for keeping the normal speed will cause the main engine ()
A

to work as overload characteristic

B

overspeed

C

over mechanical load only

D

over thermal load only


正确答案: A
解析: 暂无解析

第5题:

Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.

A.LCG

B.longitudinal moment

C.righting moment

D.inclining moment


正确答案:B
船舶上货物重心到船中剖面的距离乘以载重量得出纵向力矩。

第6题:

The Master or person in charge of a ship shall ensure the crane record book shows the ______.

A.Date and description of each failure

B.Average load in pounds for each usage

C.Total number of lifts for each usage

D.All of the above


正确答案:A

第7题:

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.

A.winch speed

B.boom strength

C.load radius

D.cable strength


正确答案:C

第8题:

The document that certifies the correctness of the load line marks on a ship is called the ______.

A.Certificate of Inspection

B.Load line certificate

C.Certificate of Documentation

D.SOLAS Certificate


正确答案:B

第9题:

The ()(浮吊) can float on water used to load and unload the cargo.

  • A、floating crane
  • B、jumbo boom
  • C、union purchase
  • D、crane

正确答案:A

第10题:

单选题
On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().
A

winch speed

B

boom strength

C

load radius

D

cable strength


正确答案: A
解析: 暂无解析