bagged cargo
drummed cargo
cased cargo
deck cargo
第1题:
Deadfreight is the charge for the ______.
A.carriage of demise cargo
B.cost of transshipment of over-carried cargo
C.difference in the amount of cargo loaded and the amount of cargo discharged
D.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel
第2题:
Your vessel is loaded with nonhygroscopic cargoes and is going from a cold to a warm climate.You should ______.
A.Start the exhaust blowers
B.Start the intake blowers
C.Not ventilate the cargo holds
D.Ventilate the cargo holds
第3题:
Never______stowed like this.
A.optional cargo should be
B.should optional cargo be
C.should be optional cargo
D.optional cargo must be
第4题:
Wedge
Dunnage
Shore
Store
第5题:
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.
A.Cargo has been loaded or discharged
B.Cargo hose is connected
C.Cargo pumps are started
D.Vessel is ready to handle cargo
第6题:
Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug. 14th. and 16th. Under favorable weather without any remarks on __________.
A.log book
B.short/over-loaded cargo list
C.the mate’s receipt
D.manifest
第7题:
Cargo securing for Ro-Ro is based on the concept of _______.
A.Solid packing
B.Rapid loading and discharge
C.Vessel loaded full and down to her marks
D.Palletized cargo
第8题:
The tentative cargo plan ________ .
A.eliminates confusion with the final stowage plan
B.shows the approximate amount of cargo to be loaded in each hold
C.expedites the total operation
D.requires an unproportional number of gang hours of work to discharge the cargo
第9题:
The()(非包装货) is loaded and discharged by belt conveyer.
第10题:
start the exhaust blowers
start the intake blowers
not ventilate the cargo holds
ventilate the cargo holds