A datacenter has exceeded the load on the central uninterrup

题目
单选题
A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the roomand is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?()
A

 Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.

B

 Plug the servers directly into the power that is not on the UPS.

C

 Add stand alone UPSs for new servers not wired off the central UPS.

D

 Continue plugging into the central UPS because the actual load supported is actually higher than stated.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

We are of course() that the period for completion of your project has already been exceeded .

A. know

B. to know

C. aware

D. sure


正确答案:C

第2题:

To safeguard the operator and other personnel working on or near a hoisting operation, which of the following precautions should be observed?

A.Keep a load on the hoist until all personnel are finished working

B.Set the load on a movable dolly when transportation may be needed

C.Have one man keep a hand on the load to steady it

D.Insure that the lifting gear capacity is not exceeded


正确答案:D

第3题:

What ________ the safe working load of the derrick?

A.is

B.be

C.are

D.has


正确答案:A

第4题:

The coastal area has very mild winter, but the central plains remain extremely cold.

A. Warm B. severe C. hard D. dry

答案:A
解析:

第5题:

The coastal area has very 【mild】 winter, but the central plains remain extremely cold.

A.warm
B.severe
C.hard
D.dry

答案:A
解析:

第6题:

We are of course()that the time for completion of your project has already been exceeded.

A、know

B、to know

C、aware

D、sure


参考答案:C

第7题:

The central theatre has a seating __ of more than 3,000 people.

A. capability

B. capacity

C. ability

D. facility


正确答案:B

第8题:

It ____ that the top quarter of a '53-metre-high statue of Buddha in Bamiyan, central Afghanistan has been blown down up by the country's ruling Taliban.

A、has reported

B、reports

C、reported

D、is reported


答案 D

解析: 本句中文意思: 据报道,阿富汗中部巴米扬一座53米高的佛像顶部四分之一已被该国执政的塔             利班炸毁。

           It is reported 是典型的it 做形式主语的句型结构,即 It+be+过去分词+主语从句,这类过去      分词有reported,announced, believed,expected, hoped, decided等。真正的主语是that从句。


第9题:

The coastal area has very 【mild】 winter, but the central plains remain extreme

A.severe
B.hard
C.warm
D.dry

答案:C
解析:

第10题:

A company has a Frame Relay WAN with one central - site router and 100 branch office routers. A partial mesh of PVCs exists: one PVC between the central site and each of t he 100 branch routers. All routers use point - to - point subinterfaces and one subnet per PVC. Which of the following is true about OSPF in this design?()

  • A、The central site router has 100 fully adjacent neighborships with the 100 branches
  • B、The central  site router has neighborships with all branch routers, but fully adjacent neighbors with only two branches
  • C、The central site router has a neighborship with the Frame Relay switcH
  • D、None of the other answers is correct

正确答案:A

更多相关问题