问题:单选题A customer is considering iDataPlex and several competitive solutions. Which of the following favor iDataPlex?()A Lowest cost of acquisition B Useable density C Flexible configurations ready for integration and testing at the customers data centerD Standard rack mounting
查看答案
问题:单选题A customer has downloaded new firmware files for the IBM support Web Site. Which of the following is the correct method for updating the firmware for the QLogic Intelligent Passthru Module using the command line?()A Transfer the file to the FC module using FTP; use Telnet to the FC module to start the updateB Use Telnet to the AMM to transfer the file using TFTP; start the updateC Transfer the file to the FC module using Secure Copy Protocol (SCP);use Telnet to the FC module to start the updateD Start the update and enter FC module IP address when prompted
问题:单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD The NPIV switch will count against the number of domains in a fabric
问题:单选题A System x administrator is considering new storage subsystems. Which of the following is a benefit of SAS over Solid State? ()A Higher transfer speeds B Increased power consumption with Solid State C Increased bandwidth D Cost per MB
问题:单选题A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()A Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface B Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module C Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet module in bay two using the AMM D Restore the configuration from NVRAM using the Switch Module Web interface
问题:单选题When selling against competition, which of the following focus on the iDataPlex value proposition? ()A Superior chip density B Balance performance, cost, and power+cooling efficiency C Flexible configurations ready for integration and testing at the customers data center D Standard rack mounting
问题:单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this? ()A Install Windows 2003 using the F6 supply Mass Storage Controller option B Replace Customers deployment solution with Tivoli Provisioning Manager for OS Deployment Director Edition C Use ServerGuide to install Windows 2003 D Deploy Customers existing image and use UXSPi to update IBM specific drivers
问题:单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()A 8 B 6 C 4 D 2
问题:单选题A Customer has Director V5 installed and is considering Systems Director V6. They ask how BladeCenter Configuration Manager works with this new version. Which of the following is the correct answer? ()A This was replaced by Configuration Manager for V6 B This must be upgraded to BladeCenter Open Fabric Manager (BOFM) for V6 C This is common to both V5 and V6, no change is required D Automation Manager must be used in V6
问题:单选题A customer plans to deploy Open Fabric Manager (OFM). Which vendors would you recommend?()A Brocade B Blade Network Technology (BNT) C Cisco D Juniper
问题:单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()A 32U B 25U C 22U D 21U
问题:单选题How many BladeCenter HT chassis will fit in a standard 19" 42U rack?()A 2. B 3 C 4 D 6
问题:单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which of the following addresses the customer issues?()A SAS drives support automatic rebuild upon failure, SATA must be rebuilt manually B SAS drives support Fibre Channel attachment to eX5 servers, SATA does not C SATA drives require different, more expensive cables, and require more floor space compared with SAS D SATA storage is slower, has lower mean time between failure, and designed for a lower duty cycle compared with SAS
问题:单选题A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request?()A Brocade Enterprise 20-port 8Gb SAN switch module B Brocade 20-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter share C Brocade Enterprise 10-port 8Gb SAN switch module D Brocade 10-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter
问题:单选题A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A Configure a 2 node x3950 X5 B Customer needs a System p server to support Oracle applications C Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D Configure a system that meets the minimum requirements
问题:单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-specific configuration? ()A Restore the configuration from NVRAM using the Switch Module Web interface B Back up the configuration of the Ethernet module in bay 1 and restore it to the Ethernet module in bay 2 using the AMM C Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module D Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface
问题:单选题In which phase should a TDA be performed?()A Server deployment B Installation and server configuration C Problem determination/resolution D Needs analysis and design