问题:单选题A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()A Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be capped.B Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be uncapped.C Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partitions to use no more than one core. Configure the HMC scheduler to dynamically assign processors among the pools over a day.D Create a shared processor pool for each production partition, with the maximum processor limit set to the licensing limit for the application in the pool. Assign the development and testing partitions to a processor pool with a maximum of 1 core. Configure each partition to use uncapped processing.
查看答案
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()A Order a 2-port 1Gbps Ethernet LAN adapter.B Order a 2-port 10Gbps Ethernet LAN adapter.C Upgrade the IVE adapter to a 4-port 1Gbps IVE adapter.D Upgrade the IVE adapter to a 2-port 10Gbps IVE adapter.
问题:单选题What is a key ability of IBM Systems Director Enterprise Edition as compared to Standard Edition?()A Manage multiple operating systems on a serverB Manage energy consumption and network traffic to increase efficiencyC Manage LPARs, operating systems and servers to reduce administrationD Manage workloads across multiple servers to optimize resource utilization
问题:单选题Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()A Redundant system clocksB Redundant service processorsC eDRAM chips have redundant L3 cacheD Main memory DIMMs contain a redundant DRAM chip
问题:单选题Which of the following functions can be performed using the Integrated Virtualization Manager?()A Concurrent firmware updatesB Management of virtual storageC Hot add/remove of I/O drawersD Management of Capacity on Demand
问题:单选题An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads. Which Blade is designed for Windows workloads?()A HS22B JS43C QS21D PS701
问题:单选题A BladeCenter S chassis with 2 storage modules requires how many power supplies?()A 1B 2C 4D 6
问题:单选题A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()A 8 desired processing units and 8 desired virtual processorsB 2 desired processing units and 8 desired virtual processorsC 8 desired processing units and 32 desired virtual processorsD 2 desired processing units and 32 desired virtual processors
问题:单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()A PowerVMB VMControlC Active Memory SharingD Active Memory Expansion
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer's budget.D Review competitive offerings, system performance and delivery schedules.
问题:单选题A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()A Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be capped. B Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be uncapped. C Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partitions to use no more than one core. Configure the HMC scheduler to dynamically assign processors among the pools over a day. D Create a shared processor pool for each production partition, with the maximum processor limit set to the licensing limit for the application in the pool. Assign the development and testing partitions to a processor pool with a maximum of 1 core. Configure each partition to use uncapped processing.
问题:单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()A Enable automatic problem reporting from smitB Use IVM to enable console mirroring to IBM Remote Support.C Use the HMC to enable reporting through Electronic Service Agent.D Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
问题:单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard EditionB VMControl Standard EditionC Hardware Management ConsoleD IBM Systems Director Standard Edition
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A A second IVE adapterB A second processor cardC PowerVM Enterprise EditionD An additional cable-management arm
问题:单选题What are key benefits of IBM Systems Director Standard Edition?()A Backup data Manage problems Monitor network systemB Report problems Manage servers and virtual environment Monitor the network C Monitor system health and network Install and manage AIX and IBM i Manage energy consumption D Monitor system health and network Manage servers and virtual environment Collect performance data
问题:单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A Purchase a second HMC and use this to manage the new servers.B Connect all of the new servers to the existing private HMC network.C Configure a second private network on their existing HMC for the new servers.D Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
问题:单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A 4B 8C 16D 32