问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents generic disk and tape device interfaces.B NPIV presents generic disk and tape device interfaces on virtual HBA addresses.vSCSI presents HBA addresses as SCSI with vendor specific information for disk and tape devices.C NPIV presents HBA addresses and vendor specific device information directly to the client partition.vSCSI presents vendor specific disk information and generic tape device interfaces through VIO server.D NPIV presents virtual HBA addresses with generic device information for SCSI based disk and tape devices.vSCSI presents vendor specific information for disk and tape device devices attached via SCSI hardware interfaces.
查看答案
问题:单选题A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions. How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()A PowerVM supports shared servers compared to VSEB PowerVM supports shared processors and memory compared to VSEC PowerVM supports shared processors, memory and I/O compared to VSED PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()A PowerHA SystemMirror Basic EditionB PowerHA SystemMirror Express EditionC PowerHA SystemMirror Standard EditionD PowerHA SystemMirror Enterprise Edition
问题:单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBM iC LinuxD VIO Server
问题:单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740
问题:单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
问题:单选题An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads. Which Blade is designed for Windows workloads?()A HS22B JS43C QS21D PS701
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl Standard EditionB Upgrade to VMControl Enterprise EditionC Upgrade to latest version of VMControl Express EditionD Download the latest fixes for VMControl Express Edition
问题:单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A Verification of the expected performance of the new solution.B A document used by IBM manufacturing to build and ship the system solution.C An IBM Quality Assurance Certificate which is supplied to the customer with the system.D A list of actions that are recommended to reduce risk and create a successful implementation.
问题:单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A e-ConfigB System Planning Tool (SPT)C IBM Workload Estimator (WLE)D IBM Performance Monitor (PM)
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer's budget.D Review competitive offerings, system performance and delivery schedules.
问题:单选题Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations. Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()A IBM eConfigB IBM Performance MonitorC IBM Workload Estimator (WLE)D IBM System Planning Tool (SPT)
问题:单选题A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()A An HMC is required for dual VIO servers.B Dual VIO servers require a split backplane.C A dual VIO enablement code must be entered from the ASMI interface.D The second VIO server must be created using the IVM command line interface.
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
问题:单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.
问题:单选题A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()A Create a system profile for each partition. Assign all needed resources as 'required'.B Define all system resources as 'desired' on the Testing partition. Activate only as needed.C Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.D Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.
问题:单选题A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()A ImplementPowerHA SystemMirror on both VIO servers.B ConfigureEtherchannel between the client LPARs and the two VIO serversC Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.D Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.