e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第1题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第2题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第3题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第4题:
A customer would like to see the components needed to perform an upgrade on their DS5100system and get a list price of the cost. What tool can the storage specialist use to generate thisdocument?()
第5题:
What current IBM resource can be used for simple-to-complex configurations and can be exported in different formats for the pricing of System x, BladeCenter and System x storage products?()
第6题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第7题:
A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()
第8题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第9题:
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()
第10题:
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()