Which of the following is considered a direct cost for producing a widget?
A . The cost of the materials used to produce a widget.
B . The labor costs of the workers who actually produced the widget.
C . The rent for the building in which the widget was manufactured
D . The salary of senior management and the project sponsor
E . A and B only
第1题:
You must produce 27 widgets. You can only produce 9 widgets per production run. Each production line setup costs $1000. Each widget consumes $10 worth of material and $5 worth of labor. What is total variable cost for producing one widget.
A . ¥1,020
B . ¥1,010
C . ¥1,015
D . ¥20
E . None of the above
第2题:
Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:
A . Overhead rates, labor rates and material costs.
B . Overhead rates, schedule slippages, and rework.
C . Rework, cost-of-living adjustments, and overtime.
D . Material costs, shipping cost, and scope changes.
E . Labor rates, material costs, and cost reporting.
第3题:
When comparing the cost of competing projects, which of the following is typically NOT considered?
A.Opportunity costs.
B.Direct costs.
C.Sunk costs.
D.Indirect costs.
E.Burden rates.
第4题:
19 It is argumentative whether project managers actually control costs. Which of the following is the most common element over which the project manager may have some degree of control?
A. Direct labor dollars
B. Direct labor hours.
C. Overhead rates.
D. Procurement costs.
E. None of the above
第5题:
144 Project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. Other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:
A. Overhead rates, labor rates and material costs.
B. Overhead rates, schedule slippages, and rework.
C. Rework, cost-of-living adjustments, and overtime.
D. Material costs, shipping cost, and scope changes.
E. Labor rates, material costs, and cost reporting
第6题:
It is argumentative whether project managers actually control costs. Which of the following is the most common element over which the project manager may have some degree of control?
A . Direct labor dollars
B . Direct labor hours.
C . Overhead rates.
D . Procurement costs.
E . None of the above.
第7题:
Which of the following statements about the cost of quality are true?
A . the cost of quality is the expense of nonconformance to requirements and specifications.
B . the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.
C . quality control programs should be implemented when the cost of quality are deemed affordable by management.
D . A and B.
E . A and C
第8题:
In which of the following cost estimating techniques are statistics models used:
A . nonparametric cost estimating
B . parametric cost estimating
C . life cycle cost estimating
D . bottom-up estimating
E . All of the above.
第9题:
16 Which of the following statements about the cost of quality are true?
A. the cost of quality is the expense of nonconformance to requirements and specifications.
B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product. C. quality control programs should be implemented when the cost of quality are deemed affordable by management.
D. A and B.
E. A and C
第10题:
183 You must produce 27 widgets. You can only produce 9 widgets per production run. Each production line setup costs $1000. Each widget consumes $10 worth of material and $5 worth of labor. What is the total fixed cost for producing the widgets.
A. $3,000
B. $27,000
C. $27,270
D. $1,335
E. $1,000