You need to design the VLAN scheme for the Company network. 

题目
多选题
You need to design the VLAN scheme for the Company network. Which two statements are true  about best practices in VLAN design?()
A

Routing should occur at the access layer ifvoice VLANs are utilized. Otherwise, routing should occur at the distribution layer.

B

Routing should always be performed at the distribution layer.

C

VLANs should be localized to a switch.

D

VLANs should be localized to a single switch unlessvoice VLANs are being utilized.

E

Routing should not be performed between VLANs located on separate switches.

如果没有搜索结果或未解决您的问题,请直接 联系老师 获取答案。
相似问题和答案

第1题:

You administer your company‘s network. All client computers run Microsoft Windows Vista. A standard user reports that they are unable to install an application. You need to install the applicatin.What should you do?()

A.A

B.B

C.C

D.D


参考答案:B

第2题:

A national retail chain needs to design an IP addressing scheme to support a nationwide network. The company needs a minimum of 300 sub-networks and a maximum of 50 host addresses per subnet. Working with only one Class B address, which of the following subnet masks will support an appropriate addressing scheme?()

A.255.255.255.0

B.255.255.255.128

C.255.255.252.0

D.255.255.255.224

E.255.255.255.192

F.255.255.248.0


参考答案:B, E

第3题:

You are an administrator of the Ezonexam switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in the Ezonexam network.

However, you need to share the VLAN information across numerous switches. Which of the following would allow you accomplish this?

A. STP

B. GVRP

C. SNMP

D. VTP

E. DHCP

F. None of the above


正确答案:D
D 解析:Explanation:
The VTP (VLAN Trunking Protocol) is a Cisco Layer 2 messaging protocol that manages the addition, deletion, and renaming of VLANs on a network-wide basis. It allows for VLAN information to span multiple switches within the switch domain.

Incorrect Answers:
A. STP is a switching protocol but it is used for preventing network loops.

B. GVARP is an actual protocol used in switch administration, but it beyond the scope of what a CCNA is expected to know.

C. SNMP is a protocol used for managing and monitoring networks

E. DHCP is the Dynamic Host Configuration Protocol, which allows for PC's to obtain their IP address dynamically upon booting up, along with their DNS and default gateway information.

第4题:

You need to implement a high availability design in the Company routed network.  Which protocol  allows for the automatic selection and simultaneous use of multiple available gateways as well as  automatic failover between those gateways?()

  • A、 VRRP
  • B、 GLBP
  • C、 IRDP
  • D、 HSRP
  • E、 None of the other alternatives apply

正确答案:B

第5题:

A national retail chain needs to design an IP addressing scheme to support a nationwide network. The company needs a minimum of 300 sub-networks and a maximum of 50 host addresses per subnet. Working with only one Class B address, which of the following subnet masks will support an appropriate addressing scheme?()

  • A、255.255.255.0
  • B、255.255.255.128
  • C、255.255.252.0
  • D、255.255.255.224
  • E、255.255.255.192
  • F、255.255.248.0

正确答案:B,E

第6题:

Refer to the exhibit. A network technician is asked to design a small network with redundancy. The exhibit represents this design, with all hosts configured in the same VLAN. What conclusions can be made about this design?()

A.The design will function as intended

B.Spanning-tree will need to be used.

C.The router will not accept the addressing scheme.

D.The connection between switches should be a trunk.

E.The router interfaces must be encapsulated with the 802.1Q protocol.


参考答案:C

第7题:

You are an administrator of a switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in your network. However, you need to share the VLAN information across numerous switches throughout your network. Which of the following would allow you accomplish this?()

  • A、STP
  • B、GVRP
  • C、SNMP
  • D、VTP
  • E、DHCP

正确答案:D

第8题:

Your company is designing its network. The network will use an IPv6 prefix of 2001:DB8:BBCC:0000::/53.You need to identify an IPv6 addressing scheme that will support 2000 subnets.Which network mask should you use?()

A. /61

B. /62

C. /63

D. /64


参考答案:D

第9题:

You are configuring a Cisco multilayer switch for the Company network.  Which command would  you use to configure a port to act as a routed interface?()

  • A、 ip routing
  • B、 switchport mode trunk
  • C、 no switchport
  • D、 switchport trunk native vlan 1
  • E、 None of the other alternatives apply

正确答案:C

第10题:

You need make configuration changes to an existing layer 3 switch in the Company network. On a  multilayer Catalyst switch,  which interface command is used to convert a Layer 3 interface to a  Layer 2 interface?()

  • A、 switchport access vlan vlan-id
  • B、 switchport
  • C、 switchport mode access
  • D、 no switchport
  • E、 None of the other alternatives apply

正确答案:B