In vessel construction,the garboard strake is ______.
A.Located next to and parallel to the keel
B.Located next to and parallel to the gunwale
C.Another term for the bilge keel
D.Another term for the rub rail
第1题:
Development is a structured design methodology that proceeds in a sequence from one phase to the next.
A.Waterfall
B.Phased
C.Prototyping
D.Parallel
第2题:
A vessel cannot comply with all of the SOLAS requirements due to its construction. Where will this be indicated?
A.Nowhere; the vessel must comply to engage in international trade
B.On the reverse of the SOLAS certificate
C.On the Exemption Certificate
D.On the Certificate of Inspection
第3题:
Overlapping activities on a project, such as design and construction, is referred to as:
A.Fast tracking
B.Risk conversion.
C.Parallel management.
D.Process improvement.
E.Synchronous manufacturing
第4题:
In vessel construction, beam brackets are triangular plates that join the deck beam to a ____.
A.bulkhead
B.frame
C.stanchion
D.deck longitudinal
第5题:
The term strake is used in reference to ______.
A.rudder mountings
B.anchor gear
C.hull plating
D.vessel framing
第6题:
● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.
(75)
A. Waterfall
B. Phased
C. Prototyping
D. Parallel
第7题:
In vessel construction,beams are transverse girders which provide support to ______.
A.Bulkheads
B.Deckhouse structures
C.Decks
D.Vertical frames
第8题:
12 Overlapping activities on a project, such as design and construction, is referred to as:
A. Fast tracking
B. Risk conversion.
C. Parallel management.
D. Process improvement.
E. Synchronous manufacturing
第9题:
The strake on each side of the keel is called a ______.
A.Sheer strake
B.Gatewood strake
C.Insulation strake
D.Garboard strake
第10题:
turn into the seas
turn to be parallel to the seas
reduce speed
increase speed