问题:单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A e-ConfigB System Planning Tool (SPT)C IBM Workload Estimator (WLE)D IBM Performance Monitor (PM)
查看答案
问题:单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A A second IVE adapterB A second processor cardC PowerVM Enterprise EditionD An additional cable-management arm
问题:单选题A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions. How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()A PowerVM supports shared servers compared to VSEB PowerVM supports shared processors and memory compared to VSEC PowerVM supports shared processors, memory and I/O compared to VSED PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
问题:单选题A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()A Create a system profile for each partition. Assign all needed resources as 'required'.B Define all system resources as 'desired' on the Testing partition. Activate only as needed.C Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.D Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.
问题:单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents generic disk and tape device interfaces.B NPIV presents generic disk and tape device interfaces on virtual HBA addresses.vSCSI presents HBA addresses as SCSI with vendor specific information for disk and tape devices.C NPIV presents HBA addresses and vendor specific device information directly to the client partition.vSCSI presents vendor specific disk information and generic tape device interfaces through VIO server.D NPIV presents virtual HBA addresses with generic device information for SCSI based disk and tape devices.vSCSI presents vendor specific information for disk and tape device devices attached via SCSI hardware interfaces.
问题:单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()A Upgrade to VMControl Standard EditionB Upgrade to VMControl Enterprise EditionC Upgrade to latest version of VMControl Express EditionD Download the latest fixes for VMControl Express Edition
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()A PowerHA SystemMirror Basic EditionB PowerHA SystemMirror Express EditionC PowerHA SystemMirror Standard EditionD PowerHA SystemMirror Enterprise Edition
问题:单选题The Power 720 is offered with how many cores?()A 1, 2, or 4B 2, 4, or 6C 2, 4, or 8D 4, 6, or 8
问题:单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer's budget.D Review competitive offerings, system performance and delivery schedules.
问题:单选题A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()A L3 onlyB L1 and L2C L2 and L3D L1, L2 and L3
问题:单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()A The Blades must use the same CIOv and CFFh expansion adapter types.B Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.C The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.D The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
问题:单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A AIXB IBM iC LinuxD VIO Server
问题:单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard EditionB VMControl Standard EditionC Hardware Management ConsoleD IBM Systems Director Standard Edition
问题:单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
问题:单选题A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()A L3 onlyB L1 and L2C L2 and L3D L1,L2 and L3
问题:单选题What is the correct stage in the sales process for a Pre-Sales Technical & Delivery Assessment (TDA)? ()A Before the first solution design meeting with the customerB After the solution design proposal is submitted to manufacturing for reviewC Once the customer has supplied the solution design specifications to the sales teamD After the solution design is completed and before the proposal is submitted to the customer
问题:单选题What is a key ability of IBM Systems Director Enterprise Edition as compared to Standard Edition?()A Manage multiple operating systems on a serverB Manage energy consumption and network traffic to increase efficiencyC Manage LPARs, operating systems and servers to reduce administrationD Manage workloads across multiple servers to optimize resource utilization